← United States data centers · All cities · Texas · All sites
City market record, every site links to its sources
Abilene, Texas:3 data centers, 1.2 GW operating.
As of 11 November 2026, Real Assets records 3 published data centers in Abilene, Texas: 1 operating and 2 planned or under construction. Reported capacity: 1.2 GW operating, 1.8 GW planned or under construction across 3 of 3 sites. Top operators by sites in Abilene: Crusoe Energy Systems (2), Microsoft (1).
Open Abilene on the map View permit PDFs & MW timeline1 operating · 2 planned · 2 operators
- Crusoe Energy Systems (2)
- Microsoft (1)
Mapped Abilene and Texas site positions (exact coordinates require sign-in)
Operators in Abilene
2 named operators across 3 sites in Abilene.
Other data center cities in Texas
- Dallas
Texas · 42 operating, 15 planned · 5.9 MW operating · 5.61 GW planned57 sites - Austin
Texas · 12 operating, 4 planned · 84.4 MW operating16 sites - Houston
Texas · 9 operating, 3 planned · 1 GW planned12 sites - San Antonio
Texas · 9 operating, 3 planned · 441.2 MW operating · 896 MW planned12 sites - Fort Worth
Texas · 4 operating, 4 planned · 126.9 MW operating · 246 MW planned8 sites - Red Oak
Texas · 3 operating, 4 planned · 185 MW operating · 690 MW planned7 sites
All 3 data centers in Abilene, Texas
- Lancium & Crusoe Clean AI Campus
Crusoe Energy Systems, operating1.2 GW - Crusoe & Lancium Abilene Expansion (Microsoft AI Factory)
Crusoe Energy Systems, under construction900 MW - Crusoe Abilene AI factory campus, Abilene
Microsoft, planned900 MW
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Locked Abilene facility dossiers & permit PDFs
View all 3 Abilene data centers, government permit PDFs & MW timeline - enter work email
Unlock exact parcel coordinates, phase-by-phase MW delivery schedules, operator ownership, and primary regulatory filings across Abilene, Texas.
Full market dataset & site-level records
Unlock all 3 Abilene data centers on the interactive map
This page summarizes the 3 published data centers in Abilene, Texas. Sign in or start a 7-day trial to inspect exact map coordinates, power and area figures, ownership records and source documents.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
How many data centers are tracked in Abilene?
3 published data centers in Abilene, Texas as of 11 November 2026: 1 operating and 2 planned or under construction. Counts reflect sourced facilities recorded in Real Assets, not a full census.
Which operators run data centers in Abilene?
Named operators in Abilene by sites tracked: Crusoe Energy Systems (2), Microsoft (1).
How much capacity is reported in Abilene?
Reported capacity: 1.2 GW operating, 1.8 GW planned or under construction across 3 of 3 sites.
Where do the Abilene figures come from?
Every site listed on this page links to its individual facility record and the original company pages, regulatory filings and press releases that published its facts.