AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
Microsoft Fairwater Campus (MKE03) is an operating data center in Mount Pleasant, Wisconsin, listed under Microsoft. Capacity is 2.72 GW according to Epoch AI Frontier Data Centers. Real Assets links 40 source pages, including Microsoft Official Blog, Cdn Official Source, Epoch AI Frontier Data Centers.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 7 data centers in Wisconsin that have a page.
Microsoft has 22 data centers on record in the United States: 10 operating and 12 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
40 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Microsoft Fairwater Campus (MKE03) on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Microsoft Fairwater Campus (MKE03) is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.
In Mount Pleasant, Wisconsin. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
2.72 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 369 MW.
From 40 linked pages by Microsoft Official Blog, Cdn Official Source, Epoch AI Frontier Data Centers, Drive Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.