AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Microsoft Fairwater Campus (MKE03):data center in Mount Pleasant, Wisconsin.

Microsoft Fairwater Campus (MKE03) is an operating data center in Mount Pleasant, Wisconsin, listed under Microsoft. Capacity is 2.72 GW according to Epoch AI Frontier Data Centers. Real Assets links 40 source pages, including Microsoft Official Blog, Cdn Official Source, Epoch AI Frontier Data Centers.

Open this site on the map Start a 7-day trial
2.72 GWcapacity
Operatingstatus
40source pages linked
2028-05-13expected completion

Facts on record

  • OperatorMicrosoft
  • City and stateMount Pleasant, Wisconsin
  • Statusoperating
  • Capacity2.72 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today369 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2028-05-13
  • Sources linked40 from 5 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 7 data centers in Wisconsin that have a page.

Microsoft has 22 data centers on record in the United States: 10 operating and 12 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

40 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

More Microsoft data centers in Wisconsin

Microsoft data centers in other states

Other data centers in Wisconsin

Full market dataset & site-level records

Open Microsoft Fairwater Campus (MKE03) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Microsoft Fairwater Campus (MKE03) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Microsoft Fairwater Campus (MKE03)?

Microsoft Fairwater Campus (MKE03) is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Microsoft Fairwater Campus (MKE03)?

In Mount Pleasant, Wisconsin. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Microsoft Fairwater Campus (MKE03) have?

2.72 GW, as stated by Epoch AI Frontier Data Centers. Operating capacity today: 369 MW.

Where does this information come from?

From 40 linked pages by Microsoft Official Blog, Cdn Official Source, Epoch AI Frontier Data Centers, Drive Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.