AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas · Abilene

Sourced site record, every fact links to its page

Crusoe, Abilene:data center in Abilene, Texas.

Crusoe, Abilene is a planned data center in Abilene, Texas, listed under Microsoft. Planned capacity is 900 MW according to Crusoe. Real Assets links 1 source page, including Crusoe.

Open this site on the map View permit PDFs & MW timeline
Abilene, TexasMicrosoft
900 MW

planned data center · 1 linked source

  • Microsoft
  • Abilene
  • Texas
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Texas peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
900 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 243 data centers on record in Real Assets, with 4.8 GW reported as operating and 75.94 GW not yet operating. Crusoe, Abilene is one of them.

Microsoft has 25 data centers on record in the United States: 10 operating and 15 planned or under construction. See Microsoft in Texas (4 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 15:30 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Crusoe, Abilene - enter work email

Unlock the complete facility dossier for Crusoe, Abilene (Abilene, Texas): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Microsoft data centers in Texas

Microsoft data centers in other states

Other data centers in Texas

Full site dossier & United States dataset

Unlock Crusoe, Abilene permit PDFs, MW timeline & 1,305 other data centers

This page is the public summary for Crusoe, Abilene in Abilene, Texas. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Crusoe, Abilene
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Microsoft in Texas

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Crusoe, Abilene?

Crusoe, Abilene is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Crusoe, Abilene?

In Abilene, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Crusoe, Abilene have?

900 MW, as stated by Crusoe. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Crusoe. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.