AWS Covington Data Center:data center in Covington, Georgia.

AWS Covington Data Center is a planned data center in Covington, Georgia, listed under Amazon. Planned capacity is 50 MW. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map Start a 7-day trial
50 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorAmazon
  • City and stateCovington, Georgia
  • Statusplanned
  • Planned capacity50 MW
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. AWS Covington Data Center is one of them.

Amazon has 30 data centers on record in the United States: 10 operating and 19 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Amazon data centers in Georgia

  • River Park
    Butts, Georgia, under construction
    250 MW

Amazon data centers in other states

Other data centers in Georgia

Full market dataset & site-level records

Open AWS Covington Data Center and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see AWS Covington Data Center on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates AWS Covington Data Center?

AWS Covington Data Center is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is AWS Covington Data Center?

In Covington, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does AWS Covington Data Center have?

50 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.