US data center power capacity and pipeline:21.4 GW operating.
As of 23 November 2026, Real Assets tracks 1,367 United States data center sites from 180 named operators. Power capacity across the market: 21.4 GW operating and 178.5 GW not yet operating (of which 63.2 GW under construction and 99.0 GW planned), reported for 499 of 1,367 sites. Texas has the most sites (241, 4.8 GW operating and 41.3 GW not yet operating), then Virginia (196) and California (94). Digital Realty runs the most (115 sites, 110 operating and 5 planned).
Start the 3-day previewNo password and no card: the 3-day preview shows 20 sites; a subscription opens all 1,367.
United States data center sites by state
| Rank | State | Sites tracked | Share of sites | Power capacity operating | Power capacity not yet operating | Sites with a figure |
|---|---|---|---|---|---|---|
| 1 | Texas | 241 | 18% | 4.8 GW | 41.3 GW | 101 of 241 |
| 2 | Virginia | 196 | 14% | 2.3 GW | 16.5 GW | 58 of 196 |
| 3 | California | 94 | 7% | 384 MW | 2.2 GW | 24 of 94 |
| 4 | Georgia | 83 | 6% | 788 MW | 11.1 GW | 34 of 83 |
| 5 | Illinois | 67 | 5% | 502 MW | 7.1 GW | 21 of 67 |
| 6 | Ohio | 58 | 4% | 1.5 GW | 6.6 GW | 26 of 58 |
| 7 | Arizona | 57 | 4% | 1.4 GW | 4.2 GW | 24 of 57 |
| 8 | Nevada | 41 | 3% | 306 MW | 3.7 GW | 12 of 41 |
| 9 | Pennsylvania | 40 | 3% | 113 MW | 3.8 GW | 14 of 40 |
| 10 | New Jersey | 38 | 3% | 203 MW | 490 MW | 9 of 38 |
Largest United States data center operators
| Rank | Operator | Sites tracked | Operating sites | Planned sites | Power capacity operating | Power capacity not yet operating |
|---|---|---|---|---|---|---|
| 1 | Digital Realty | 115 | 110 | 5 | 964 MW | 1.2 GW |
| 2 | Equinix | 107 | 87 | 20 | not reported | 240 MW |
| 3 | DataBank | 88 | 72 | 16 | 133 MW | 1.5 GW |
| 4 | 62 | 35 | 27 | 3.0 GW | 12.2 GW | |
| 5 | CyrusOne | 57 | 42 | 15 | 320 MW | 1.4 GW |
| 6 | Flexential | 49 | 45 | 4 | 36 MW | 108 MW |
| 7 | Aligned Data Centers | 45 | 24 | 20 | not reported | 540 MW |
| 8 | QTS Data Centers | 44 | 27 | 15 | 2.1 GW | 5.4 GW |
| 9 | Switch | 44 | 27 | 17 | 130 MW | 520 MW |
| 10 | Amazon | 41 | 11 | 29 | 1.9 GW | 13.5 GW |
Primary filings from the largest operators
- Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01)8-K, 30 October 2026
- Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01)8-K, 9 November 2026
- DataBank: DataBank $2.0B Equity Financing (AustralianSuper & DigitalBridge) & 65+ US Data Center Footprint Report8-K / Earnings Release, 8 October 2025
- Google: Alphabet Inc. 8-K 2026-11-05: Other Events (8.01)8-K, 5 November 2026
- CyrusOne: CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio ReportAnnual Report, 10 June 2025
Site-level records behind this answer
Open every United States data center site behind these figures
This page answers "US data center power capacity and pipeline" from public aggregates. Start the 3-day preview or sign in to see each site, operator and source.
- Every data center site on the interactive map, with its operator and status
- Power capacity by site, operating and not yet operating kept apart
- Sourced deals and filings, with the page behind every figure
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 23 November 2026; this page was built on 23 November 2026 at 08:28 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How much data center power capacity is operating and under construction in the United States?
Power capacity across the market: 21.4 GW operating and 178.5 GW not yet operating (of which 63.2 GW under construction and 99.0 GW planned), reported for 499 of 1,367 sites. Operating and not yet operating figures are kept apart and never added together. A site with no stated power capacity is not counted as zero.
Which states have the most United States data center sites?
Texas: 241 sites (18% of those tracked, 4.8 GW operating and 41.3 GW not yet operating); Virginia: 196 sites (14% of those tracked, 2.3 GW operating and 16.5 GW not yet operating); California: 94 sites (7% of those tracked, 384 MW operating and 2.2 GW not yet operating). Data updated 23 November 2026.
Who are the largest United States data center operators?
By sites tracked: Digital Realty (115 sites, 110 operating and 5 planned, 964 MW operating); Equinix (107 sites, 87 operating and 20 planned); DataBank (88 sites, 72 operating and 16 planned, 133 MW operating). Ranked by sites tracked, not by power capacity.