← Europe data centers · All sites · Spain
Sourced site record, every fact links to its page
EdgeConneX Barcelona BCN01:data center in Sant Boi de Llobregat, Spain.
EdgeConneX Barcelona BCN01 is an operating data center in Sant Boi de Llobregat, Spain, listed under EdgeConneX. Capacity is 8.4 MW according to www.edgeconnex.com. Real Assets links 2 source pages, including EdgeConneX, edgeconnex.com.
Open this site on the map View permit PDFs & MW timelineoperating data center · 2 linked sources
- EdgeConneX
- Sant Boi de Llobregat
- Spain
Approximate metro position & Spain peer sites (exact coordinates require sign-in)
Facts on record
- OperatorEdgeConneX
- City and countrySant Boi de Llobregat, Spain
- Statusoperating
- Capacity8.4 MW, as stated by www.edgeconnex.com
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Spain has 37 data centers on record in Real Assets, with 402.5 MW reported as operating and 4.35 GW not yet operating. EdgeConneX Barcelona BCN01 is one of them.
EdgeConneX has 6 data centers on record in Europe: 6 operating and 0 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- EdgeConneX Barcelona BCN01 - 20 MW Data Center in Sant Boi de Llobregat, Barcelona, Spain
EdgeConneX, edgeconnex.com, published 15 September 2026Web page - data center audit capacity_mw
www.edgeconnex.com, published 25 March 2021Web page - Government permit PDFs, regulatory filings & municipal zoning records (Sant Boi de Llobregat, Spain)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for EdgeConneX Barcelona BCN01🔒 MW timeline
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for EdgeConneX Barcelona BCN01 - enter work email
Unlock the complete facility dossier for EdgeConneX Barcelona BCN01 (Sant Boi de Llobregat, Spain): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
EdgeConneX data centers in other countries
- EdgeConneX Dublin DUB01
Dublin, Ireland, operating18 MW - EdgeConneX Amsterdam AMS01 Campus
Schiphol-Rijk, Netherlands, operatingNot recorded - EdgeConneX Brussels BRU01 Campus
Ternat, Belgium, operatingNot recorded - EdgeConneX Munich MUC01
Aschheim, Germany, operatingNot recorded - EdgeConneX Warsaw WAW01
Warsaw, Poland, operatingNot recorded
Other data centers in Spain
- O-Green San Mateo de Gállego Data Center Campus
San Mateo de Gállego, Spain, planned570 MW - AWS Aragon El Burgo de Ebro Campus
Zaragoza, Spain, operating350 MW - AWS Aragon Villanueva de Gállego Campus
Zaragoza, Spain, operating350 MW - AWS Aragon Huesca Campus (Plhus)
Huesca, Spain, operating300 MW - Blackstone Aragon AI Campus (Project Rodes)
Calatorao, Spain, under construction300 MW - IREN Badajoz AI Data Center Campus
Badajoz, Spain, planned300 MW
Full site dossier & Europe dataset
Unlock EdgeConneX Barcelona BCN01 permit PDFs, MW timeline & 511 other data centers
This page is the public summary for EdgeConneX Barcelona BCN01 in Sant Boi de Llobregat, Spain. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for EdgeConneX Barcelona BCN01
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for EdgeConneX in Spain
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates EdgeConneX Barcelona BCN01?
EdgeConneX Barcelona BCN01 is recorded under EdgeConneX. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is EdgeConneX Barcelona BCN01?
In Sant Boi de Llobregat, Spain. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does EdgeConneX Barcelona BCN01 have?
8.4 MW, as stated by www.edgeconnex.com. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by EdgeConneX, edgeconnex.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.