← Asia-Pacific data centers · All sites · Japan
Sourced site record, every fact links to its page
Digital Edge TYO2:data center in Chuo, Japan.
Digital Edge TYO2 is an operating data center in Chuo, Japan, listed under Digital Edge. Capacity is 1 MW according to Digital Edge. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 1 source page, including Digital Edge.
Open this site on the map View the full site recordoperating data center · 1 linked source
- Digital Edge
- Chuo
- Japan
Approximate position and Japan peer sites (the exact position needs sign-in)
Facts on record
- OperatorDigital Edge
- City and countryChuo, Japan
- Statusoperating
- Capacity1 MW, as stated by Digital Edge
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 12 January 2024 to 12 November 2026
- Sources linked1 from 1 publisher
- Record updated17 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Japan has 78 data centers on record in Real Assets, with 675 MW reported as operating and 476 MW not yet operating. Digital Edge TYO2 is one of them.
Digital Edge has 15 data centers on record in Asia-Pacific: 12 operating and 3 planned or under construction. See Digital Edge in Japan (6 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Data Centers in Japan | Digital Edge
Digital Edge, digitaledgedc.com, published 18 January 2026Web page
1 source on record. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for Digital Edge TYO2 (12 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites
More Digital Edge data centers in Japan
- Digital Edge TYO4, 5, 6 (Yokohama campus)
Yokohama, Japan, operating18.5 MW - Digital Edge OSA1
Osaka, Japan, operating14.4 MW - Digital Edge TYO7
Chuo, Japan, operating4.8 MW - Digital Edge TYO3
Shinjuku, Japan, operating3.9 MW - Digital Edge TYO1
Bunkyo, Japan, operating3.8 MW
Digital Edge data centers in other countries
- Digital Edge CGK Campus
Bekasi, Indonesia, under construction500 MW - Digital Edge Bandar Cemerlang Johor Campus
Ulu Tiram, Malaysia, planned200 MW - Digital Edge SEL3
Incheon, South Korea, under construction60 MW - Digital Edge SEL2 (Bupyeong, Incheon)
Incheon, South Korea, operating36 MW - Digital Edge EDGE2 (Kuningan Mulia Jakarta)
Jakarta, Indonesia, operating23 MW - Digital Edge NARRA1 Manila
Binan, Philippines, operating10 MW
Other data centers in Japan
- AirTrunk TOK1
Inzai, Japan, operating300 MW - EdgeConneX Yawata Data Center Campus (Greater Osaka)
Yawata, Japan, planned150 MW - TOK2
Hino, Japan, operating110 MW - OSK2
Osaka, Japan, planned100 MW - Colt Data Centre Services, Yoshikawa
Yoshikawa, Japan, planned80 MW - SC Zeus Data Center Osaka
Osaka, Japan, under construction70 MW
Full site dossier & Asia-Pacific dataset
Open Digital Edge TYO2 and 703 other data centers
This page is the public summary for Digital Edge TYO2 in Chuo, Japan. Sign in to see its full record: 1 source page.
- Digital Edge TYO2 on the interactive map, with the sites around it
- All 1 linked source page
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Digital Edge TYO2?
Digital Edge TYO2 is recorded under Digital Edge. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Digital Edge TYO2?
In Chuo, Japan. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Digital Edge TYO2 have?
1 MW, as stated by Digital Edge. Operating capacity today is not recorded.
Is Digital Edge TYO2 under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for Digital Edge TYO2 (12 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 1 linked page by Digital Edge. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.