TOK2:data center in Hino, Japan.
TOK2 is an operating data center in Hino, Japan, listed under AirTrunk. Capacity is 110 MW according to airtrunk.com. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 3 source pages, including airtrunk.com, Data Centre Review.
Open this site on the map View the full site recordoperating data center · 3 linked sources
- AirTrunk
- Hino
- Japan
Approximate position and Japan peer sites (the exact position needs sign-in)
Facts on record
- OperatorAirTrunk
- City and countryHino, Japan
- Statusoperating
- Capacity110 MW, as stated by airtrunk.com
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 7 January 2024 to 12 November 2026
- Sources linked3 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Japan has 78 data centers on record in Real Assets, with 675 MW reported as operating and 476 MW not yet operating. TOK2 is one of them.
AirTrunk has 22 data centers on record in Asia-Pacific: 10 operating and 12 planned or under construction. See AirTrunk in Japan (3 sites). Compare Equinix vs AirTrunk.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- data center audit 9 status
airtrunk.com, published 13 May 2024Web page - AirTrunk announces second hyperscale data centre in Tokyo
Data Centre Review, datacentrereview.com, published 17 May 2022Web page - 1 additional source filing & extracted fact citations for TOK2
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for TOK2 (7 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites
More AirTrunk data centers in Japan
- AirTrunk TOK1
Inzai, Japan, operating300 MW - OSK2
Osaka, Japan, planned100 MW
AirTrunk data centers in other countries
- Tootipala data centre campus (1,400 MW)
Anakapalli, India, planned1.4 GW - Kurri Kurri data centre site (former Hydro Aluminium smelter)
Kurri Kurri, Australia, planned540 MW - Rambilli data centre campus (400 MW)
Anakapalli, India, planned400 MW - AirTrunk MEL2 Campus
Tullamarine, Australia, planned354 MW - AirTrunk MEL1
Melbourne, Australia, operating185 MW - AirTrunk JHB1
Iskandar Puteri, Malaysia, operating150 MW
Other data centers in Japan
- EdgeConneX Yawata Data Center Campus (Greater Osaka)
Yawata, Japan, planned150 MW - Colt Data Centre Services, Yoshikawa
Yoshikawa, Japan, planned80 MW - SC Zeus Data Center Osaka
Osaka, Japan, under construction70 MW - Equinix TY12x Tokyo xScale Hyperscale (Inzai)
Inzai, Japan, operating54 MW - Colt Osaka Keihanna Data Centre
Seika, Japan, operating45 MW - MC Digital Realty NRT12 (Inzai Campus)
Inzai, Japan, operating34 MW
Full site dossier & Asia-Pacific dataset
Open TOK2 and 703 other data centers
This page is the public summary for TOK2 in Hino, Japan. Sign in to see its full record: 3 source pages.
- TOK2 on the interactive map, with the sites around it
- All 3 linked source pages
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates TOK2?
TOK2 is recorded under AirTrunk. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is TOK2?
In Hino, Japan. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does TOK2 have?
110 MW, as stated by airtrunk.com. Operating capacity today is not recorded.
Is TOK2 under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for TOK2 (7 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 3 linked pages by airtrunk.com, Data Centre Review. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.