2024 to 2026 satellite roof-growth tracking across 124 Vietnam ready-built factories and warehouses: 36 filling, 18 little change. Every row links to the facility's public record and original sources; the interactive 2024 vs 2026 curtain slider opens inside the workspace.

124tracked sites
36filling since 2024
18little change
2024 to 2026comparison window

Operators: 2024 vs 2026 buildout

#OperatorTrackedFillingLittle changePipeline fillingPipeline little changeFilings
1BW Industrial Development JSC3913 (33%)7166,000 sqm19,000 sqm1 filing
2SLP (SEA Logistic Partners)189 (50%)1not reportednot reported1 filing
3KTG Industrial145 (36%)0not reportednot reported1 filing
4KCN Vietnam Group143 (21%)1not reportednot reported1 filing
5ESR Group31 (33%)0not reportednot reported1 filing
6Gaw NP Industrial40 (0%)2not reportednot reportedprivate / none
7LŌ-GOI Group40 (0%)0not reportednot reportedprivate / none
8Frasers Property20 (0%)0not reportednot reported6 filings
9ITL Corporation20 (0%)2not reportednot reportedprivate / none
10Sembcorp Industries20 (0%)0not reportednot reportedprivate / none

Includes operators with at least 2 satellite-tracked sites. Pipeline columns count planned and under-construction sites only, never operating capacity.

Provinces: 2024 vs 2026 buildout

  • Tay Ninh
    13 filling (93%) · 1 little change
    14 tracked
  • Dong Nai
    10 filling (48%) · 1 little change
    21 tracked
  • Bac Ninh
    6 filling (19%) · 0 little change
    32 tracked
  • Hai Phong
    4 filling (24%) · 5 little change
    17 tracked
  • Hung Yen
    2 filling (33%) · 3 little change
    6 tracked
  • Ho Chi Minh City
    0 filling (0%) · 4 little change
    22 tracked
  • Quang Ninh
    0 filling (0%) · 0 little change
    4 tracked
  • Ninh Binh
    0 filling (0%) · 0 little change
    3 tracked
  • Thai Nguyen
    0 filling (0%) · 2 little change
    2 tracked
#ProvinceTrackedFillingLittle changePipeline fillingPipeline little change
1Tay Ninh1413 (93%)154,000 sqmnot reported
2Dong Nai2110 (48%)1not reportednot reported
3Bac Ninh326 (19%)0112,000 sqmnot reported
4Hai Phong174 (24%)5not reportednot reported
5Hung Yen62 (33%)3not reportednot reported
6Ho Chi Minh City220 (0%)4not reported19,000 sqm
7Quang Ninh40 (0%)0not reportednot reported
8Ninh Binh30 (0%)0not reportednot reported
9Thai Nguyen20 (0%)2not reportednot reported

Includes provinces with at least 2 satellite-tracked sites.

Vietnam ready-built factories and warehouses with 2024 vs 2026 satellite passes

All 124 satellite-tracked Vietnam ready-built factories and warehouses, sorted with active 2024 to 2026 roof growth (filling) first.
#SiteOperatorLocationStatus2024 vs 2026 roof change
1BW Phu An ThanhBW Industrial Development JSCLong An, Tay NinhUnder constructionFilling (+15 to +23 pts)
2Phu An Thanh Industrial ParkKCN Vietnam GroupTay NinhOperatingFilling (+15 to +23 pts)
3BW Industrial Nhon Trach 2 - Loc KhangBW Industrial Development JSCDong NaiOperatingFilling (+14 to +22 pts)
4BW Industrial Nhon Trach 1BW Industrial Development JSCDong NaiOperatingFilling (+14 to +22 pts)
5Nhon Trach 5 Industrial ParkKCN Vietnam GroupDong NaiOperatingFilling (+14 to +22 pts)
6KTG Nhon Trach 2 Phase 4 (Double-Storey)KTG IndustrialDong NaiOperatingFilling (+14 to +22 pts)
7KTG Nhon Trach 2 Phase 3KTG IndustrialDong NaiOperatingFilling (+14 to +22 pts)
8KTG Nhon Trach 3AKTG IndustrialDong NaiOperatingFilling (+14 to +22 pts)
9KTG Nhon Trach 2 Phase 1KTG IndustrialDong NaiOperatingFilling (+14 to +22 pts)
10KTG Nhon Trach 2 Phase 2KTG IndustrialDong NaiOperatingFilling (+14 to +22 pts)
11BW Industrial Lot CN3-03 Non-tariff Zone and Nam Dinh Vu (CN3-03 Non-tariff Zone and Nam Dinh Vu Industrial Zone (Zone 1) Dinh Vu - Cat Hai Economic Zone)BW Industrial Development JSCHai PhongOperatingFilling (+11 to +19 pts)
12SLP Park Hai PhongSLP (SEA Logistic Partners)Hai PhongOperatingFilling (+11 to +19 pts)
13BW-ESR Nam Dinh Vu (Phase 1)BW Industrial Development JSCHai PhongOperatingFilling (+11 to +19 pts)
14BW Nam Dinh Vu 2BW Industrial Development JSCHai PhongOperatingFilling (+11 to +19 pts)
15BW Industrial Xuyen A (H)BW Industrial Development JSCLong An, Tay NinhOperatingFilling (+10 to +18 pts)
16SLP Park Xuyen ASLP (SEA Logistic Partners)Long An, Tay NinhOperatingFilling (+10 to +18 pts)
17BW Thuan Dao Logistics ParkBW Industrial Development JSCTay NinhOperatingFilling (+10 to +18 pts)
18BW Xuyen A Logistics ParkBW Industrial Development JSCTay NinhOperatingFilling (+10 to +18 pts)
19BW-ESR Nam Son Hap Linh Logistics ParkBW Industrial Development JSCBac NinhUnder constructionFilling (+8 to +16 pts)
20SLP Park Nam Son Hap Linh Building A02SLP (SEA Logistic Partners)Bac NinhOperatingFilling (+8 to +16 pts)
21SLP Park Nam Son Hap Linh Building A01SLP (SEA Logistic Partners)Bac NinhOperatingFilling (+8 to +16 pts)
22SLP Park Nam Son Hap Linh Building A03SLP (SEA Logistic Partners)Bac NinhOperatingFilling (+8 to +16 pts)
23SLP Park Nam Son Hap Linh Building A04SLP (SEA Logistic Partners)Bac NinhOperatingFilling (+8 to +16 pts)
24SLP Park Nam Son Hap Linh Building A05SLP (SEA Logistic Partners)Bac NinhOperatingFilling (+8 to +16 pts)
25Ho Nai Industrial ParkKCN Vietnam GroupDong NaiOperatingFilling (+3 to +11 pts)
26BW Industrial Song May (B-4)BW Industrial Development JSCDong NaiOperatingFilling (+3 to +11 pts)
27BW Industrial VSIP Nghe An (2)BW Industrial Development JSCNghe AnOperatingFilling (+2 to +10 pts)
28BW Vinh Loc 2BW Industrial Development JSCLong An, Tay NinhOperatingFilling (+2 to +10 pts)
29Cobi Logis Centers (Long Hau)Cobi LogisCan Giuoc, Tay NinhOperatingFilling (+2 to +10 pts)
30LOGOS Long Hau Logistics ParkESR GroupCan Giuoc, Tay NinhOperatingFilling (+2 to +10 pts)
31Unnamed RBF project in Hung Yen (Q3 2025)Hung YenOperatingFilling (+2 to +10 pts)
32SLP Park Long Hau Building A02SLP (SEA Logistic Partners)Long An, Tay NinhOperatingFilling (+2 to +10 pts)
33Transimex Long An Cold Storage - Phase 1TransimexLong An, Tay NinhOperatingFilling (+2 to +10 pts)
34SLP Park Long Hau Building A01SLP (SEA Logistic Partners)Long An, Tay NinhOperatingFilling (+2 to +10 pts)
35Long Hau IP RBF expansion (13,000 m²)Long Hau Corporation (LHC)Tay NinhOperatingFilling (+2 to +10 pts)
36FPV Industrial Centre Yen My - Phase 1FPV Industrial Centre Yen MyYen My II, Hung YenOperatingFilling (+2 to +10 pts)
37GNP Yen Binh 2 Industrial CenterGaw NP IndustrialThai NguyenOperatingLittle change (0 to +8 pts)
38GNP Yen Binh 1 Industrial CenterGaw NP IndustrialThai NguyenOperatingLittle change (0 to +8 pts)
39Unnamed RBW project in Hung Yen (Q3 2025)Hung YenOperatingLittle change (0 to +8 pts)
40WINC Hai PhongWIIN Vietnam Investment & Industry Co.Hai PhongOperatingLittle change (-2 to +6 pts)
41BW Phu Nghia Logistics ParkBW Industrial Development JSCHanoiOperatingLittle change (-2 to +6 pts)
42BW VSIP Hai Duong Industrial HubBW Industrial Development JSCHai PhongOperatingLittle change (-2 to +6 pts)
43DHP Nam Cau KienDHPHai PhongOperatingLittle change (-2 to +6 pts)
44SLP Park Loc An - Binh SonSLP (SEA Logistic Partners)Long Thanh, Dong NaiPlannedLittle change (-2 to +6 pts)
45BW Industrial Cam Dien - Luong Dien (2)BW Industrial Development JSCHai Duong, Hai PhongOperatingLittle change (-4 to +4 pts)
46BW Dong An 2BW Industrial Development JSCHo Chi Minh CityUnder constructionLittle change (-4 to +4 pts)
47BW VSIP 2A Logistics ParkBW Industrial Development JSCHo Chi Minh CityOperatingLittle change (-4 to +4 pts)
48KIZUNA Serviced Factory ComplexKIZUNALong An, Tay NinhOperatingLittle change (-4 to +4 pts)
49Phuc Dien - Hai Phong Industrial ParkKCN Vietnam GroupHai PhongUnder constructionLittle change (-4 to +4 pts)
50BW Industrial Pho NoiBW Industrial Development JSCHung YenOperatingLittle change (-5 to +3 pts)
51Core5 Hung Yen RBFIndochina Kajima Development CompanyHung YenOperatingLittle change (-5 to +3 pts)
52BW Industrial VSIP II-A (No.2 Road 10)BW Industrial Development JSCBinh Duong, Ho Chi Minh CityOperatingLittle change (-6 to +2 pts)
53ITL Logistics Center Da Nang - cold storage hubITL CorporationDa NangOperatingLittle change (-6 to +2 pts)
54ITL VSIP 1 cold warehouse & distribution centerITL CorporationHo Chi Minh CityOperatingLittle change (-6 to +2 pts)
55BW Industrial Bau Bang ExpansionBW Industrial Development JSCBinh Duong, Ho Chi Minh CityOperatingDated passes
56BW Industrial Thoi Hoa (A4)BW Industrial Development JSCBinh Duong, Ho Chi Minh CityOperatingDated passes
57Tan Hung 1 Industrial ParkKCN Vietnam GroupBac NinhPlannedDated passes
58BW Bau Bang 06BW Industrial Development JSCBecamex Bau Bang, Ho Chi Minh CityOperatingDated passes
59BW Industrial My Phuoc 3BW Industrial Development JSCBinh Duong, Ho Chi Minh CityOperatingDated passes
60Thuan Thanh III G1 Industrial ParkKCN Vietnam GroupBac NinhOperatingDated passes
61Deep C - Hai Phong Industrial ParkKCN Vietnam GroupHai PhongUnder constructionDated passes
62Song Than - HCMC Industrial ParkKCN Vietnam GroupHo Chi Minh CityOperatingDated passes
63Song Than III CN8 Industrial ParkKCN Vietnam GroupBinh Duong, Ho Chi Minh CityOperatingDated passes
64GNP Nam Dinh Vu - Industrial CenterGaw NP IndustrialHai PhongOperatingDated passes
65BW Industrial Dau GiayBW Industrial Development JSCDong NaiOperatingDated passes
66LOGOS Dau Giay Logistics ParkESR GroupDong NaiOperatingDated passes
67LOGOS Bac Ninh Logistics Estate (VSIP Bac Ninh Phase 1)LŌ-GOI GroupBac NinhOperatingDated passes
68BW VSIP Bac Ninh 2BW Industrial Development JSCBac NinhUnder constructionDated passes
69Sembcorp Hai Phong RBF project (Phase 1)Sembcorp IndustriesHai PhongOperatingDated passes
70LŌ-GOI Tan Phu Trung A1-5LŌ-GOI GroupCu Chi, Ho Chi Minh CityPlannedDated passes
71Vietnam Nhon Trach 6D LEED Warehouse Campus Industrial ParkKCN Vietnam GroupDong NaiOperatingDated passes
72Sembcorp Logistics Park Dinh VuSembcorp IndustriesHai PhongOperatingDated passes
73DV3 RBF units (Ninh Binh / Ha Nam)Ninh BinhPlannedDated passes
74LOGOS Hung Yen HY1 (Logos Hung Yen Project)LŌ-GOI GroupHung YenOperatingDated passes
75LŌ-GOI Tan Phu Trung B6-5LŌ-GOI GroupCu Chi, Ho Chi Minh CityPlannedDated passes
76Eco Logistics CentreFrasers PropertyBinh Duong, Ho Chi Minh CityOperatingDated passes
77SLP Park Tien DuSLP (SEA Logistic Partners)Tien Du, Bac NinhPlannedDated passes
78BW Industrial Le Minh Xuan 3 (J)BW Industrial Development JSCHo Chi Minh CityOperatingDated passes
79BW Industrial Bac Tien Phong (CN2.1C - Bac Tien Phong Industrial Park)BW Industrial Development JSCQuang NinhOperatingDated passes
80Deep C - 2B Industrial ParkKCN Vietnam GroupHai PhongOperatingDated passes
81Mapletree Logistics Park Binh Duong Phase 3Mapletree Logistics TrustBinh Duong, Ho Chi Minh CityOperatingDated passes
82BW Industrial VSIP Hai Phong Phase 2BW Industrial Development JSCVSIP Hai Phong, Hai PhongOperatingDated passes
83An Phat High-Tech Industrial ParkKCN Vietnam GroupHai PhongUnder constructionDated passes
84BW Industrial IN3-11*A (IN3-11*A)BW Industrial Development JSCHai PhongOperatingDated passes
85Frasers Yen Phong 2CFrasers PropertyBac NinhOperatingDated passes
86KTG Yen Phong II CKTG IndustrialBac NinhOperatingDated passes
87KTG Industrial Yen Phong IIC - Phase 2KTG IndustrialBac NinhOperatingDated passes
88Nhon Trach VI Industrial ParkKCN Vietnam GroupDong NaiOperatingDated passes
89KTG Industrial VSIP Bac Ninh 2 - Phase 1KTG IndustrialYen Phong, Bac NinhOperatingDated passes
90Unnamed RBW project in Dong NaiDong NaiOperatingDated passes
91Logis Valley Warehouse (Yen Phong)Logis ValleyBac NinhOperatingDated passes
92KTG Yen Phong IIKTG IndustrialBac NinhOperatingDated passes
93Unnamed RBF project in Dong NaiDong NaiOperatingDated passes
94KTG Nhon Trach TextileKTG IndustrialDong NaiOperatingDated passes
95KTG An PhuocKTG IndustrialDong NaiOperatingDated passes
96Unnamed RBF project in the Northern Key Economic Zone (Q2 2025)Bac NinhOperatingDated passes
97KTG Tam Phuoc AKTG IndustrialDong NaiOperatingDated passes
98Dong Viet warehouseDong Viet JSCBac NinhOperatingDated passes
99KTG Yen Phong IKTG IndustrialBac NinhOperatingDated passes
100SLP Park Bac Ninh Building A02SLP (SEA Logistic Partners)Bac NinhOperatingDated passes
101DV3 RBW warehouse (Ninh Binh / Ha Nam)Ninh BinhPlannedDated passes
102SLP Park Bac Ninh Building A01SLP (SEA Logistic Partners)Bac NinhOperatingDated passes
103SLP Park Bac Ninh Building A04SLP (SEA Logistic Partners)Bac NinhOperatingDated passes
104SLP Park Bac Ninh Building A05SLP (SEA Logistic Partners)Bac NinhOperatingDated passes
105KTG Tam Phuoc BKTG IndustrialDong NaiOperatingDated passes
106nPL Logistics Cu Chi ready-built warehouseNPL LogisticsHo Chi Minh CityOperatingDated passes
107BW Bau Bang Industrial Hub (Phase 2 - 3)BW Industrial Development JSCHo Chi Minh CityOperatingDated passes
108BW Deep C Quang Ninh Industrial Hub Phase 1BW Industrial Development JSCQuang NinhOperatingDated passes
109BW Deep C Quang Ninh Industrial Hub Phase 2BW Industrial Development JSCQuang NinhOperatingDated passes
110BW My Phuoc 4 Industrial HubBW Industrial Development JSCHo Chi Minh CityOperatingDated passes
111BW Que Vo 2 Industrial HubBW Industrial Development JSCBac NinhOperatingDated passes
112BW Supply Chain CityBW Industrial Development JSCHo Chi Minh CityPlannedDated passes
113BW Tan Phu Trung Logistics ParkBW Industrial Development JSCHo Chi Minh CityOperatingDated passes
114BW Thuan Thanh 3B Phase 2BW Industrial Development JSCBac NinhOperatingDated passes
115BW-ESR Yen Phong Industrial & Logistics ParkBW Industrial Development JSCBac NinhUnder constructionDated passes
116GNP Dong Van 3 Industrial CenterGaw NP IndustrialHa Nam City, Ninh BinhOperatingDated passes
117LOGOS Yen Phong 2AESR GroupBac NinhOperatingDated passes
118MOL RBF in Quang Ninh (Song Khoai / Quang Yen)CapitaLand InvestmentSong Khoai, Quang Yen, Quang NinhUnder constructionDated passes
119Saigon VRG Ready-Built Factory (Binh Chanh)Saigon VRG Investment Corporation (SIP)Binh Chanh, Ho Chi Minh CityOperatingDated passes
120SLP Park Yen Phong Building A01SLP (SEA Logistic Partners)Bac NinhOperatingDated passes

Showing top 120 of 124 tracked sites; browse all facilities on the sites directory.

SEC filings, annual reports and financing disclosures for tracked Vietnam operators

Publicly disclosed SEC Form 10-K/8-K/20-F filings, ASX/SGX/KRX/Bursa annual reports, and syndicated green loan disclosures for operators tracked above.
#Operator & disclosureTypePublisherDateFiling
1BW Industrial Development JSC: BW Industrial Development JSC (Warburg Pincus & Becamex IDC) $3B+ 10M sqm Vietnam Logistics & RBF Portfolio Report
Details BW Industrial's position as Vietnam's largest institutional industrial and logistics platform with >10M sqm of land and 3.5M+ sqm GFA across 50+ projects in 12 provinces (Binh Duong, Dong.
Annual ReportBW Industrial / Warburg Pincus2025-05-10Open filing
2KCN Vietnam Group: KCN Vietnam Group ($300M+ Ready-Built Factory & Warehouse Portfolio Across 10 Vietnam Industrial Parks)
Details KCN Vietnam's 300+ hectare land bank and 14+ ready-built factory and warehouse phases across Deep C Hai Phong, Thuan Thanh III, Tan Hung, An Phat, Ho Nai, Phu My 3, Nhon Trach 6, and Phu An.
Annual ReportKCN Vietnam Group2025-04-22Open filing
3KTG Industrial: KTG Industrial & Boustead Projects (SGX: AVM) Vietnam Ready-Built Factory & Logistics Center Portfolio Report
Covers KTG Industrial's joint venture with Boustead Projects spanning 14+ ready-built factory and warehouse estates in Nhon Trach (Dong Nai), Yen Phong (Bac Ninh), and VSIP Bac Ninh.
Annual ReportKTG Industrial / Boustead2025-04-18Open filing
4SLP (SEA Logistic Partners): SEA Logistic Partners (SLP / GLP) 1.5M+ sqm Vietnam Modern Warehouse & Ready-Built Factory Portfolio Report
Covers SLP's 18+ modern Grade-A logistics warehouse and ready-built factory parks exceeding 1.5M sqm GFA across Bac Ninh (Yen Phong, Que Vo, Thuan Thanh), Hai Phong (Deep C, Nam Dinh Vu), Hung Yen.
Annual ReportSLP / GLP2025-05-05Open filing
5ESR Group: E ESR AR2022 Reduct
ESR Group Limited FY2022 Annual Report detailing New Economy real estate AUM, fund management fee income, data centre and logistics development pipeline across APAC.
Filingwww.esr.com2022-12-31Open filing
6Long Hau Corporation (LHC): Long Hau Corporation 2025 Annual Report
The 2025 Annual Report for Long Hau Corporation provides a comprehensive overview of the company's business performance, investment attraction activities, and financial status. It details the.
Annual ReportLong Hau Corporation (LHG)2026-03-27Open filing
7Frasers Property: Frasers Property: Announcement of Appointment of Chief Executive Officer, Frasers Property Industrial
PRESS RELEASE 1 Frasers Property appoints Jai Mirpuri as Chief Executive Officer of its industrial and logistics business  Mr Mirpuri will report to the Group Chief Executive...
SGX Transaction FilingFrasers Property (SGX announcements)2026-10-13Open filing
8Frasers Property: Frasers Property: Announcement of Cessation of Appointment of Chief Executive Officer, Frasers Hospitality
This transition follows the successful privatisation of Frasers Hospitality Trust (FHT) in 2025 and the subsequent completion of the FHT portfolio optimisation on 30 September 2026. With these.
SGX Corporate FilingFrasers Property (SGX announcements)2026-10-09Open filing
9Frasers Property: Frasers Property: Completion Of The Proposed FHT Portfolio Optimisation
Frasers Property Limited (the “ Company”) refers to : (i) the announcement of the Company dated 25 June 2026 titled “The Proposed FHT Portfolio Optimisation”; and (ii) the Circular. The Company is.
SGX Transaction FilingFrasers Property (SGX announcements)2026-09-30Open filing
10Mapletree Logistics Trust: Mapletree Logistics Trust: Second Quarter and/or Half Yearly Results
(Constituted in the Republic of Singapore pursuant to a Trust Deed dated 5 July 2004 (as amended))
SGX Results / Business UpdateMapletree Logistics Trust (SGX announcements)2026-10-28Open filing
11Mapletree Logistics Trust: Mapletree Logistics Trust Strengthens Singapore Portfolio with Changi South Redevelopment
Mapletree Logistics Trust plans to redevelop two assets in Singapore into a five-storey, Grade A ramp-up warehouse with an estimated development cost of around S$141 million. Located in Changi.
SGX Corporate FilingMapletree Logistics Trust (SGX announcements)2026-10-28Open filing
12Mapletree Logistics Trust: Mapletree Logistics Trust: Completion of Divestment of a Property in Australia
Following this divestment, MLT’s portfolio stands at 172 properties and the total value of assets under management is S$13.1 billion1. The value of Units and the income derived from them may fall as.
SGX Transaction FilingMapletree Logistics Trust (SGX announcements)2026-10-23Open filing
13CapitaLand Investment: CapitaLand Investment: Cessation of Mr Miguel Ko as Chairman
Explore our investor relations resources, including financial results, business updates, annual reports and stock information for the investor community.
Annual ReportCapitaLand Investment (SGX announcements)2026-10-22Open filing
14CapitaLand Investment: CapitaLand Investment: Appointment of Ms Png Chin Yee as Non-Executive Non-Independent Director
Explore our investor relations resources, including financial results, business updates, annual reports and stock information for the investor community.
Annual ReportCapitaLand Investment (SGX announcements)2026-10-22Open filing
15CapitaLand Investment: CapitaLand Investment: UPDATES TO BOARD COMPOSITION
Explore our investor relations resources, including financial results, business updates, annual reports and stock information for the investor community.
Annual ReportCapitaLand Investment (SGX announcements)2026-10-22Open filing
16Saigon VRG Investment Corporation (SIP): SIP - Duy trì đà tăng trưởng bền vững
This research report provides an update on the business performance and investment outlook for Saigon VRG Investment Corporation (SIP). It analyzes the company's industrial park portfolio in.
FilingSHS (Saigon-Hanoi Securities)2026-05-13Open filing
17Saigon VRG Investment Corporation (SIP): Sài Gòn VRG Báo cáo thường niên 2025
This is the 2025 Annual Report for Saigon VRG Investment Corp (SIP), detailing the company's business operations, financial performance, and corporate governance. The report covers the company's.
FilingSaigon VRG Investment Corp (SIP)2026-04-18Open filing
18Saigon VRG Investment Corporation (SIP): SIP Flash note (5 Feb 2026)FilingACB Securities (ACBS)2026-02-05Open filing

Full market dataset & site-level records

Open the interactive 2024 vs 2026 satellite slider for 124 Vietnam ready-built factories and warehouses

Inspect before-and-after 10 m satellite imagery side by side, exact parcel coordinates, and every sourced filing.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

What does the 2024 vs 2026 satellite tracker measure?

It compares clear 10 m satellite passes from 2024 against 2025 to 2026 passes for each mapped ready-built factories and warehouse campus. Sites where roofed share rose by more than 5 percentage points are labeled filling; others with clear passes are labeled little change.

How many Vietnam ready-built factories and warehouses have 2024 vs 2026 satellite comparisons?

As of 19 November 2026, 124 published Vietnam ready-built factories and warehouses carry 2024 vs 2026 satellite pass comparisons (36 filling since 2024, 18 little change).

Why are exact roof percentages not published?

Real Assets publishes the percentage-point change range and the 2024 to 2026 direction so buyers can separate active buildout from announcements without republishing raw derived coverage levels. The interactive before-and-after curtain slider is inside the workspace.