AnalystAIReal Assets Start free trial

← Vietnam ready-built factories and warehouses · All sites · Dong Nai

Sourced site record, every fact links to its page

KTG Nhon Trach 2 Phase 4 (Double-Storey):ready-built factory and warehouse in Dong Nai, Dong Nai.

KTG Nhon Trach 2 Phase 4 (Double-Storey) is an operating ready-built factory and warehouse in Dong Nai, Dong Nai, listed under KTG Industrial. Reported floor area is 34,975 sqm (about 376,473 sq ft). Real Assets links 1 source page, including ktgindustrial.com.

Open this site on the map Start a 7-day trial
Dong Nai, Dong NaiKTG Industrial
34,975 sqm

operating ready-built factory and warehouse · 1 linked source

  • KTG Industrial
  • Dong Nai
  • Dong Nai
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Dong Nai peer sites (exact coordinates require sign-in)

34,975 sqmfloor area
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorKTG Industrial
  • City and provinceDong Nai, Dong Nai
  • Statusoperating
  • Floor area34,975 square metres (about 376,473 square feet)
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated30 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Dong Nai has 22 ready-built factories and warehouses on record in Real Assets, with 310,500 sqm reported as operating and 97,000 sqm not yet operating. KTG Nhon Trach 2 Phase 4 (Double-Storey) is one of them.

KTG Industrial has 14 ready-built factories and warehouses on record in Vietnam: 2 operating and 0 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 31 October 2026 at 05:38 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More KTG Industrial ready-built factories and warehouses in Dong Nai

KTG Industrial ready-built factories and warehouses in other provinces

Other ready-built factories and warehouses in Dong Nai

Full market dataset & site-level records

Open KTG Nhon Trach 2 Phase 4 (Double-Storey) and 769 other ready-built factories and warehouses

This page is the public summary. Start a 7-day trial or sign in to see KTG Nhon Trach 2 Phase 4 (Double-Storey) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates KTG Nhon Trach 2 Phase 4 (Double-Storey)?

KTG Nhon Trach 2 Phase 4 (Double-Storey) is recorded under KTG Industrial. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is KTG Nhon Trach 2 Phase 4 (Double-Storey)?

In Dong Nai, Dong Nai. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How large is KTG Nhon Trach 2 Phase 4 (Double-Storey)?

34,975 square metres (about 376,473 square feet).

Where does this information come from?

From 1 linked page by ktgindustrial.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.