← Vietnam ready-built factories and warehouses · All sites · Bac Ninh
Sourced site record, every fact links to its page
BW Thuan Thanh 3B Phase 2:ready-built factory and warehouse in Bac Ninh, Bac Ninh.
BW Thuan Thanh 3B Phase 2 is an operating ready-built factory and warehouse in Bac Ninh, Bac Ninh, listed under BW Industrial Development JSC. Reported floor area is 159 sqm (about 1,711 sq ft). Real Assets links 4 source pages, including BW Industrial, bwindustrial.com.
Open this site on the map Start a 7-day trialoperating ready-built factory and warehouse · 4 linked sources
- BW Industrial Development JSC
- Bac Ninh
- Bac Ninh
Approximate metro position & Bac Ninh peer sites (exact coordinates require sign-in)
Facts on record
- OperatorBW Industrial Development JSC
- City and provinceBac Ninh, Bac Ninh
- Statusoperating
- Floor area159 square metres (about 1,711 square feet)
- Expected completionNot recorded
- Sources linked4 from 2 publishers
- Record updated30 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Bac Ninh has 32 ready-built factories and warehouses on record in Real Assets, with 511,366 sqm reported as operating and 298,559 sqm not yet operating. BW Thuan Thanh 3B Phase 2 is one of them.
BW Industrial Development JSC has 40 ready-built factories and warehouses on record in Vietnam: 21 operating and 6 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 30 October 2026; this page was built on 31 October 2026 at 05:38 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- BW Thuan Thanh 3B Industrial Hub
BW Industrial, bwindustrial.comWeb page - Trung Tâm Công Nghiệp BW Thuận Thành 3B - BW Industrial
bwindustrial.comWeb page
4 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.
More BW Industrial Development JSC ready-built factories and warehouses in Bac Ninh
- BW VSIP Bac Ninh 2
Bac Ninh, Bac Ninh, under construction112,000 sqm - BW-ESR Nam Son Hap Linh Logistics Park
Bac Ninh, Bac Ninh, under construction112,000 sqm - BW-ESR Yen Phong Industrial & Logistics Park
Bac Ninh, Bac Ninh, under construction145 sqm
BW Industrial Development JSC ready-built factories and warehouses in other provinces
- BW Industrial Bau Bang Expansion
Binh Duong, Ho Chi Minh City, operating457,400 sqm - BW Industrial Cam Dien - Luong Dien (2)
Hai Duong, Hai Phong, operating426,000 sqm - BW Industrial Thoi Hoa (A4)
Binh Duong, Ho Chi Minh City, operating385,000 sqm - BW Bau Bang 06
Becamex Bau Bang, Ho Chi Minh City, operating300,000 sqm - BW Industrial My Phuoc 3
Binh Duong, Ho Chi Minh City, operating240,000 sqm - BW Industrial Xuyen A (H)
Long An, Tay Ninh, operating222,500 sqm
Other ready-built factories and warehouses in Bac Ninh
- Yen Phong Industrial Park
Bac Ninh, Bac Ninh, operating6,580,000 sqm - VSIP Bac Ninh Integrated Township & Industrial Park
Tu Son, Bac Ninh, operating6,390,000 sqm - Que Vo Industrial Park
Bac Ninh, Bac Ninh, operating6,000,000 sqm - Quang Chau Industrial Park
Bac Giang, Bac Ninh, operating5,160,000 sqm - Yen Lu Industrial Zone
Bac Giang, Bac Ninh, under construction3,770,000 sqm - Dong Phuc Industrial Zone
Bac Giang, Bac Ninh, planned3,546,300 sqm
Full market dataset & site-level records
Open BW Thuan Thanh 3B Phase 2 and 769 other ready-built factories and warehouses
This page is the public summary. Start a 7-day trial or sign in to see BW Thuan Thanh 3B Phase 2 on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates BW Thuan Thanh 3B Phase 2?
BW Thuan Thanh 3B Phase 2 is recorded under BW Industrial Development JSC. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is BW Thuan Thanh 3B Phase 2?
In Bac Ninh, Bac Ninh. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How large is BW Thuan Thanh 3B Phase 2?
159 square metres (about 1,711 square feet).
Where does this information come from?
From 4 linked pages by BW Industrial, bwindustrial.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.