AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

Vantage Frontier (Lick Mountain):data center in Albany / Shackelford County, Texas.

Vantage Frontier (Lick Mountain) is an under construction data center in Albany / Shackelford County, Texas, listed under Vantage Data Centers. Planned capacity is 1.4 GW according to Epoch AI Frontier Data Centers. Real Assets links 15 source pages, including Epoch AI Frontier Data Centers, Epoch AI Frontier Research, SemiAnalysis Datacenter Research.

Open this site on the map Start a 7-day trial
1.4 GWplanned capacity
Under constructionstatus
15source pages linked
2026 (Building 1)expected completion

Facts on record

  • OperatorVantage Data Centers
  • City and stateAlbany / Shackelford County, Texas
  • Statusunder construction
  • Planned capacity1.4 GW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land area485.6 hectares (about 1,200 acres)
  • Building floor areaNot recorded
  • Expected completion2026 (Building 1)
  • Sources linked15 from 4 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Vantage Frontier (Lick Mountain) is one of them.

Vantage Data Centers has 24 data centers on record in the United States: 11 operating and 13 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

15 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

More Vantage Data Centers data centers in Texas

Vantage Data Centers data centers in other states

Other data centers in Texas

Full market dataset & site-level records

Open Vantage Frontier (Lick Mountain) and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Vantage Frontier (Lick Mountain) on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Vantage Frontier (Lick Mountain)?

Vantage Frontier (Lick Mountain) is recorded under Vantage Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Vantage Frontier (Lick Mountain)?

In Albany / Shackelford County, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Vantage Frontier (Lick Mountain) have?

1.4 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 15 linked pages by Epoch AI Frontier Data Centers, Epoch AI Frontier Research, SemiAnalysis Datacenter Research, Web Official Source. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.