Townsite Solar 2 LLC:data center in Boulder City, Nevada.

Townsite Solar 2 LLC is a planned data center in Boulder City, Nevada, listed under Townsite Solar 2 LLC. Planned capacity is 170 MW according to Data Center Dynamics. Real Assets links 3 source pages, including Data Center Dynamics, rtoinsider.com.

Open this site on the map Start a 7-day trial
170 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorTownsite Solar 2 LLC
  • City and stateBoulder City, Nevada
  • Statusplanned
  • Planned capacity170 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Nevada has 17 data centers on record in Real Assets, with 1 GW reported as operating and 4.58 GW not yet operating. Townsite Solar 2 LLC is one of them.

Townsite Solar 2 LLC has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Nevada

Full market dataset & site-level records

Open Townsite Solar 2 LLC and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Townsite Solar 2 LLC on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Townsite Solar 2 LLC?

Townsite Solar 2 LLC is recorded under Townsite Solar 2 LLC. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Townsite Solar 2 LLC?

In Boulder City, Nevada. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Townsite Solar 2 LLC have?

170 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Data Center Dynamics, rtoinsider.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.