AnalystAIReal Assets
Start free trial← United States data centers · All sites · Indiana
Sourced site record, every fact links to its page
Microsoft LaPorte County Hyperscale Campus is an under construction data center in LaPorte / LaPorte County, Indiana, listed under Microsoft. Capacity is not recorded. Real Assets links 2 source pages, including convergedigest.com, WNDU.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Indiana has 22 data centers on record in Real Assets, with 3.7 GW reported as operating and 10.01 GW not yet operating. Microsoft LaPorte County Hyperscale Campus is one of them.
Microsoft has 22 data centers on record in the United States: 10 operating and 12 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Microsoft LaPorte County Hyperscale Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Microsoft LaPorte County Hyperscale Campus is recorded under Microsoft. The operator is the name its sources give, which can differ from the owner or the tenant.
In LaPorte / LaPorte County, Indiana. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
No capacity figure is recorded for this site. Real Assets does not estimate one.
From 2 linked pages by convergedigest.com, WNDU. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.