AnalystAIReal Assets Start free trial

← United States data centers · All sites

Sourced site record, every fact links to its page

Core Scientific: Muskogee 1:data center in Muskogee, Oklahoma.

Core Scientific: Muskogee 1 is a planned data center in Muskogee, Oklahoma, listed under Core Scientific. Planned capacity is 181 MW according to Epoch AI Frontier Data Centers. Real Assets links 14 source pages, including Applications Official Source, Epoch AI Frontier Data Centers, Epoch AI Frontier Research.

Open this site on the map Start a 7-day trial
181 MWplanned capacity
Plannedstatus
14source pages linked
2027-12-31expected completion

Facts on record

  • OperatorCore Scientific
  • City and stateMuskogee, Oklahoma
  • Statusplanned
  • Planned capacity181 MW, as stated by Epoch AI Frontier Data Centers
  • Operating capacity today0 MW
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completion2027-12-31
  • Sources linked14 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 5 data centers in Oklahoma that have a page.

Core Scientific has 10 data centers on record in the United States: 7 operating and 3 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

14 sources on record; the 8 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Core Scientific data centers in other states

Other data centers in Oklahoma

Full market dataset & site-level records

Open Core Scientific: Muskogee 1 and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Core Scientific: Muskogee 1 on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Core Scientific: Muskogee 1?

Core Scientific: Muskogee 1 is recorded under Core Scientific. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Core Scientific: Muskogee 1?

In Muskogee, Oklahoma. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Core Scientific: Muskogee 1 have?

181 MW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.

Where does this information come from?

From 14 linked pages by Applications Official Source, Epoch AI Frontier Data Centers, Epoch AI Frontier Research. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.