← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
Core Scientific: Cottonwood 1 & 2:data center in Pecos, Texas.
Core Scientific: Cottonwood 1 & 2 is a planned data center in Pecos, Texas, listed under Core Scientific. Planned capacity is 300 MW according to Core Scientific. Real Assets links 2 source pages, including Data Center Dynamics, Core Scientific.
Open this site on the map View permit PDFs & MW timelineplanned data center · 2 linked sources
- Core Scientific
- Pecos
- Texas
Approximate metro position & Texas peer sites (exact coordinates require sign-in)
Facts on record
- OperatorCore Scientific
- City and statePecos, Texas
- Statusplanned
- Planned capacity300 MW, as stated by Core Scientific
- Expected completionNot recorded
- Sources linked2 from 2 publishers
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Texas has 243 data centers on record in Real Assets, with 4.8 GW reported as operating and 75.94 GW not yet operating. Core Scientific: Cottonwood 1 & 2 is one of them.
Core Scientific has 10 data centers on record in the United States: 7 operating and 3 planned or under construction. See Core Scientific in Texas (4 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Core Scientific secures 300MW capacity at Pecos data center in Texas, looks to behind-the-meter power
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page - Texas Data Center | High-Density Facility in Pecos
Core Scientific, corescientific.com, published 24 March 2025Web page - Government permit PDFs, regulatory filings & municipal zoning records (Pecos, Texas)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Core Scientific: Cottonwood 1 & 2🔒 MW timeline
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Core Scientific: Cottonwood 1 & 2 - enter work email
Unlock the complete facility dossier for Core Scientific: Cottonwood 1 & 2 (Pecos, Texas): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Core Scientific data centers in Texas
- Core Scientific / CoreWeave Denton AI Compute Hub
Denton, Texas, operating395 MW - Core Scientific Austin 1
Austin, Texas, operatingNot recorded - Core Scientific Denton 1
Denton, Texas, operatingNot recorded
Core Scientific data centers in other states
- Core Scientific: Muskogee 1
Muskogee, Oklahoma, planned181 MW - Core Scientific: Dalton 4
Whitfield, Georgia, planned170 MW - Core Scientific Auburn 1
Auburn, Alabama, operating50 MW - Core Scientific Dalton 1 & 2
Dalton, Georgia, operating40 MW - Core Scientific Calvert 1, 2, & 3
Calvert, Kentucky, operatingNot recorded - Core Scientific Grand Forks 1
Grand Forks, North Dakota, operatingNot recorded
Other data centers in Texas
- Project Matador
Panhandle, Texas, under construction17 GW - GridFree AI South Dallas One
Dallas, Texas, planned5 GW - Sailfish Comanche Circle
Tolar, Texas, planned5 GW - Prometheus Pecos Project
Pecos, Texas, planned2.5 GW - Amp Energy East Texas
Lufkin, Texas, planned2.1 GW - IREN Sweetwater Mega-Hub (Sweetwater 1 & 2)
Sweetwater, Texas, under construction2 GW
Full site dossier & United States dataset
Unlock Core Scientific: Cottonwood 1 & 2 permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Core Scientific: Cottonwood 1 & 2 in Pecos, Texas. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Core Scientific: Cottonwood 1 & 2
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Core Scientific in Texas
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Core Scientific: Cottonwood 1 & 2?
Core Scientific: Cottonwood 1 & 2 is recorded under Core Scientific. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Core Scientific: Cottonwood 1 & 2?
In Pecos, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Core Scientific: Cottonwood 1 & 2 have?
300 MW, as stated by Core Scientific. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Data Center Dynamics, Core Scientific. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.