AnalystAIReal Assets
Start free trial← United States data centers · All sites · Georgia
Sourced site record, every fact links to its page
Core Scientific: Dalton 4 is a planned data center in Whitfield, Georgia, listed under Core Scientific. Planned capacity is 170 MW. Real Assets links 1 source page, including Data Center Dynamics.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. Core Scientific: Dalton 4 is one of them.
Core Scientific has 10 data centers on record in the United States: 7 operating and 3 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Core Scientific: Dalton 4 on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Core Scientific: Dalton 4 is recorded under Core Scientific. The operator is the name its sources give, which can differ from the owner or the tenant.
In Whitfield, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
170 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.