AnalystAIReal Assets Start free trial

← United States data centers · All sites · North Carolina

Sourced site record, every fact links to its page

Compass Stateville Data Center:data center in Iredell, North Carolina.

Compass Stateville Data Center is a planned data center in Iredell, North Carolina, listed under Compass Datacenters. Planned capacity is 500 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics, GovTech (TNS reprint of Statesville Record & Landmark/Charlotte Observer).

Open this site on the map Start a 7-day trial
500 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCompass Datacenters
  • City and stateIredell, North Carolina
  • Statusplanned
  • Planned capacity500 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

North Carolina has 23 data centers on record in Real Assets, with 91 MW reported as operating and 3.95 GW not yet operating. Compass Stateville Data Center is one of them.

Compass Datacenters has 10 data centers on record in the United States: 3 operating and 7 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Compass Datacenters data centers in other states

Other data centers in North Carolina

Full market dataset & site-level records

Open Compass Stateville Data Center and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Compass Stateville Data Center on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Compass Stateville Data Center?

Compass Stateville Data Center is recorded under Compass Datacenters. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Compass Stateville Data Center?

In Iredell, North Carolina. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Compass Stateville Data Center have?

500 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by Data Center Dynamics, GovTech (TNS reprint of Statesville Record & Landmark/Charlotte Observer). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.