AnalystAIReal Assets Start free trial

← United States data centers · All sites · Arizona

Sourced site record, every fact links to its page

Compass PHX II Campus:data center in El Mirage, Arizona.

Compass PHX II Campus is a planned data center in El Mirage, Arizona, listed under Compass Datacenters. Planned capacity is 108 MW according to Data Center Dynamics. Real Assets links 3 source pages, including Data Center Dynamics, Baxtel, Compass Datacenters.

Open this site on the map Start a 7-day trial
108 MWplanned capacity
Plannedstatus
3source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCompass Datacenters
  • City and stateEl Mirage, Arizona
  • Statusplanned
  • Planned capacity108 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked3 from 3 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Arizona has 33 data centers on record in Real Assets, with 1.79 GW reported as operating and 7.87 GW not yet operating. Compass PHX II Campus is one of them.

Compass Datacenters has 10 data centers on record in the United States: 3 operating and 7 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

3 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Compass Datacenters data centers in Arizona

Compass Datacenters data centers in other states

Other data centers in Arizona

Full market dataset & site-level records

Open Compass PHX II Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Compass PHX II Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Compass PHX II Campus?

Compass PHX II Campus is recorded under Compass Datacenters. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Compass PHX II Campus?

In El Mirage, Arizona. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Compass PHX II Campus have?

108 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 3 linked pages by Data Center Dynamics, Baxtel, Compass Datacenters. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.