← United States data centers · All sites · Pennsylvania
Sourced site record, every fact links to its page
AWS Susquehanna Nuclear Campus (Cumulus):data center in Berwick, Pennsylvania.
AWS Susquehanna Nuclear Campus (Cumulus) is an operating data center in Berwick, Pennsylvania, listed under Amazon. Capacity is 960 MW according to Data Center Dynamics. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 16 source pages, including DatacenterHawk Market Research, Epoch AI Frontier Data Centers.
Open this site on the map View the full site recordoperating data center · 16 linked sources
- Amazon
- Berwick
- Pennsylvania
Approximate position and Pennsylvania peer sites (the exact position needs sign-in)
Facts on record
- OperatorAmazon
- City and stateBerwick, Pennsylvania
- Statusoperating
- Capacity960 MW, as stated by Data Center Dynamics
- Expected completion2027-08-01
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 29 April 2024 to 6 October 2026
- Sources linked16 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 27 figures
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Pennsylvania has 41 data centers on record in Real Assets, with 113 MW reported as operating and 9.78 GW not yet operating. AWS Susquehanna Nuclear Campus (Cumulus) is one of them.
Amazon has 42 data centers on record in the United States: 12 operating and 29 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Geographical Shifts and Power Strategies in Data Center Growth - datacenterHawk
DatacenterHawk Market Research, datacenterhawk.com, published 19 October 2026Web page - Epoch AI Frontier Data Centers Dossier: AWS Berwick
Epoch AI Frontier Data Centers, docs.google.com, published 19 October 2026Web page - 14 additional source filings & extracted fact citations for AWS Susquehanna Nuclear Campus (Cumulus)
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
16 sources on record; 2 shown above and 14 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open AWS Susquehanna Nuclear Campus (Cumulus)'s record: 16 source pages, 27 sourced figures and 1 recorded deal - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for AWS Susquehanna Nuclear Campus (Cumulus) (29 April 2024 to 6 October 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
Amazon data centers in other states
- AWS Hobart Data Center Campus
Hobart, Indiana, planned2.4 GW - Amazon AWS Project Rainier AI Mega-Campus
New Carlisle, Indiana, operating2.25 GW - Amazon AWS Madison County Mega-Campus
Canton, Mississippi, operating2.2 GW - Amazon Ridgeland
Ridgeland, Mississippi, operating1.01 GW - Amazon, Trenton
Trenton, Ohio, planned1 GW - Pecos County Data Center at GW Ranch
Fort Stockton, Texas, planned1 GW
Other data centers in Pennsylvania
- Aligned Project Phoenix Data Center Campus
Shippingport, Pennsylvania, under construction2 GW - Nebius Highridge Business Park
Ashland, Pennsylvania, planned1.2 GW - Project Laurel Campus
Pottstown, Pennsylvania, planned750 MW - 1547 Chester County PA
Malvern, Pennsylvania, planned450 MW - Starpointe Business Park
Burgettstown, Pennsylvania, planned350 MW - CoreWeave Lancaster
Lancaster, Pennsylvania, planned300 MW
Full site dossier & United States dataset
Open AWS Susquehanna Nuclear Campus (Cumulus) and 1,276 other data centers
This page is the public summary for AWS Susquehanna Nuclear Campus (Cumulus) in Berwick, Pennsylvania. Sign in to see its full record: 16 source pages, 27 sourced figures and 1 recorded deal.
- AWS Susquehanna Nuclear Campus (Cumulus) on the interactive map, with the sites around it
- All 16 linked source pages
- 27 sourced figures, each with its page and quote
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates AWS Susquehanna Nuclear Campus (Cumulus)?
AWS Susquehanna Nuclear Campus (Cumulus) is recorded under Amazon. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is AWS Susquehanna Nuclear Campus (Cumulus)?
In Berwick, Pennsylvania. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does AWS Susquehanna Nuclear Campus (Cumulus) have?
960 MW, as stated by Data Center Dynamics. Operating capacity today is not recorded.
Is AWS Susquehanna Nuclear Campus (Cumulus) under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for AWS Susquehanna Nuclear Campus (Cumulus) (29 April 2024 to 6 October 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 16 linked pages by DatacenterHawk Market Research, Epoch AI Frontier Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.