AnalystAIReal Assets Start free trial

← United States data centers · All cities · Arizona · All sites

City market record, every site links to its sources

Chandler, Arizona:4 data centers, 169 MW operating.

As of 11 November 2026, Real Assets records 4 published data centers in Chandler, Arizona: 4 operating and 0 planned or under construction. Reported capacity: 169 MW operating across 1 of 4 sites. Top operators by sites in Chandler: CyrusOne (3), Digital Realty (1).

Open Chandler on the map View permit PDFs & MW timeline
Chandler, ArizonaUnited States data centers
4

4 operating · 0 planned · 2 operators

  • CyrusOne (3)
  • Digital Realty (1)
🔒Pin details & exact coordinates locked · Unlock Chandler map

Mapped Chandler and Arizona site positions (exact coordinates require sign-in)

Instant code or 1-click sign-in:
4sites tracked in Chandler
4operating
0planned or under construction
169 MWcapacity operating

Operators in Chandler

2 named operators across 4 sites in Chandler.

Other data center cities in Arizona

  • Phoenix
    Arizona · 18 operating, 5 planned · 316 MW operating
    23 sites
  • Maricopa
    Arizona · 0 operating, 6 planned · 5.12 GW planned
    6 sites
  • Goodyear
    Arizona · 4 operating, 1 planned · 853 MW operating · 212 MW planned
    5 sites
  • Mesa
    Arizona · 2 operating, 3 planned · 400 MW operating · 498 MW planned
    5 sites
  • Avondale
    Arizona · 1 operating, 2 planned · 225 MW operating · 240 MW planned
    3 sites

All 78 United States data center cities

All 4 data centers in Chandler, Arizona

Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.

Locked Chandler facility dossiers & permit PDFs

View all 4 Chandler data centers, government permit PDFs & MW timeline - enter work email

Unlock exact parcel coordinates, phase-by-phase MW delivery schedules, operator ownership, and primary regulatory filings across Chandler, Arizona.

Instant 6-digit code or 1-click work sign-in (no password):

Full market dataset & site-level records

Unlock all 4 Chandler data centers on the interactive map

This page summarizes the 4 published data centers in Chandler, Arizona. Sign in or start a 7-day trial to inspect exact map coordinates, power and area figures, ownership records and source documents.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

How many data centers are tracked in Chandler?

4 published data centers in Chandler, Arizona as of 11 November 2026: 4 operating and 0 planned or under construction. Counts reflect sourced facilities recorded in Real Assets, not a full census.

Which operators run data centers in Chandler?

Named operators in Chandler by sites tracked: CyrusOne (3), Digital Realty (1).

How much capacity is reported in Chandler?

Reported capacity: 169 MW operating across 1 of 4 sites.

Where do the Chandler figures come from?

Every site listed on this page links to its individual facility record and the original company pages, regulatory filings and press releases that published its facts.