AnalystAIReal Assets Start the 3-day preview

← Europe data centers · All sites · Sweden

Sourced site record, every fact links to its page

Hamre 1 (Hamre Industrial Park, 300MW data center campus):data center in Långsele, Sweden.

Hamre 1 (Hamre Industrial Park, 300MW data center campus) is a planned data center in Långsele, Sweden, listed under atNorth. Planned capacity is 300 MW according to greenmountain.no. Real Assets links 2 source pages, including greenmountain.no, atnorth.com.

Open this site on the map View the full site record
Långsele, SwedenatNorth
300 MW

planned data center · 2 linked sources

  • atNorth
  • Långsele
  • Sweden
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Sweden peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
300 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatoratNorth
  • City and countryLångsele, Sweden
  • Statusplanned
  • Planned capacity300 MW, as stated by greenmountain.no
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated13 November 2026
  • Deals recorded on this site🔒 1 deal

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Sweden has 20 data centers on record in Real Assets, with 123 MW reported as operating and 1.02 GW not yet operating. Hamre 1 (Hamre Industrial Park, 300MW data center campus) is one of them.

atNorth has 13 data centers on record in Europe: 5 operating and 8 planned or under construction. See atNorth in Sweden (3 sites). Compare Digital Realty vs atNorth.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Hamre 1 (Hamre Industrial Park, 300MW data center campus)'s record: 2 source pages and 1 recorded deal - enter work email

Sign in to see every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

More atNorth data centers in Sweden

atNorth data centers in other countries

Other data centers in Sweden

Full site dossier & Europe dataset

Open Hamre 1 (Hamre Industrial Park, 300MW data center campus) and 500 other data centers

This page is the public summary for Hamre 1 (Hamre Industrial Park, 300MW data center campus) in Långsele, Sweden. Sign in to see its full record: 2 source pages and 1 recorded deal.

  • All 2 linked source pages
  • 1 recorded deal on this site

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Hamre 1 (Hamre Industrial Park, 300MW data center campus)?

Hamre 1 (Hamre Industrial Park, 300MW data center campus) is recorded under atNorth. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Hamre 1 (Hamre Industrial Park, 300MW data center campus)?

In Långsele, Sweden. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Hamre 1 (Hamre Industrial Park, 300MW data center campus) have?

300 MW, as stated by greenmountain.no. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by greenmountain.no, atnorth.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.