AnalystAIReal Assets Start free trial

← Europe data centers · All sites · United Kingdom

Sourced site record, every fact links to its page

Google Waltham Cross:data center in Cheshunt, United Kingdom.

Google Waltham Cross is an operating data center in Cheshunt, United Kingdom, listed under Google. Capacity is 124 MW according to Epoch AI Frontier Data Centers. Real Assets links 5 source pages, including Datacenters Official Source, Epoch AI Frontier Data Centers.

Open this site on the map Start a 7-day trial
124 MWcapacity
Operatingstatus
5source pages linked
Not recordedexpected completion

Facts on record

  • OperatorGoogle
  • City and countryCheshunt, United Kingdom
  • Statusoperating
  • Capacity124 MW, as stated by Epoch AI Frontier Data Centers
  • Expected completionNot recorded
  • Sources linked5 from 2 publishers
  • Record updated26 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

United Kingdom has 25 data centers on record in Real Assets, with 669.1 MW reported as operating and 3.86 GW not yet operating. Google Waltham Cross is one of them.

Google has 8 data centers on record in Europe: 8 operating and 0 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

5 sources on record; the 2 most recent are listed. The links open the original pages, not copies. How the data is built and what a source line means.

Google data centers in other countries

Other data centers in United Kingdom

Full market dataset & site-level records

Open Google Waltham Cross and 226 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Google Waltham Cross on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (https://realassets.analystai.ai/mcp)

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Google Waltham Cross?

Google Waltham Cross is recorded under Google. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Google Waltham Cross?

In Cheshunt, United Kingdom. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Google Waltham Cross have?

124 MW, as stated by Epoch AI Frontier Data Centers. Operating capacity today is not recorded.

Where does this information come from?

From 5 linked pages by Datacenters Official Source, Epoch AI Frontier Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.