← Europe data centers · All sites · United Kingdom
Sourced site record, every fact links to its page
Equinix LD4 / LD5 / LD6 / LD10 Slough Campus:data center in Slough, United Kingdom.
Equinix LD4 / LD5 / LD6 / LD10 Slough Campus is an operating data center in Slough, United Kingdom, listed under Equinix. Capacity is 95 MW according to Equinix. Real Assets links 1 source page, including Equinix.
Open this site on the map Start a 7-day trialFacts on record
- OperatorEquinix
- City and countrySlough, United Kingdom
- Statusoperating
- Capacity95 MW, as stated by Equinix
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated26 October 2026
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
United Kingdom has 25 data centers on record in Real Assets, with 669.1 MW reported as operating and 3.86 GW not yet operating. Equinix LD4 / LD5 / LD6 / LD10 Slough Campus is one of them.
Equinix has 63 data centers on record in Europe: 63 operating and 0 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 29 October 2026; this page was built on 30 October 2026 at 05:25 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- London LD6 | Equinix
Equinix, equinix.comWeb page
1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.
More Equinix data centers in United Kingdom
- Equinix Hertfordshire Campus (DC01UK)
South Mimms, United Kingdom, planned250 MW - LD5
Slough, United Kingdom, operatingNot recorded
Equinix data centers in other countries
- Equinix FR9x / FR11x (xScale Hyperscale)
Frankfurt, Germany, operating54 MW - Equinix PA3 / PA4 / PA10 Saint-Denis Campus
Saint-Denis, France, operating50 MW - Equinix FR2 / FR2.1 / FR2.2 Frankfurt
Frankfurt, Germany, operating45 MW - Equinix AM3 / AM4 Science Park
Amsterdam, Netherlands, operating38 MW - Equinix FR8 Frankfurt
Frankfurt, Germany, operating32 MW - Equinix WA3 Warsaw
Warsaw, Poland, operating24 MW
Other data centers in United Kingdom
- Blackstone / QTS Blyth AI Hyperscale Campus
Blyth, United Kingdom, planned1 GW - Elsham Tech Park
North Lincolnshire, United Kingdom, planned1 GW - Data Centre & Ecology Park
East Havering (London), United Kingdom, planned600 MW - Vantage campus
Bridgend, Wales, United Kingdom, planned400 MW - Vantage campus
St Athan, Wales, United Kingdom, planned250 MW - Shelborn Asset Management Edinburgh Campus
Edinburgh, United Kingdom, planned213 MW
Full market dataset & site-level records
Open Equinix LD4 / LD5 / LD6 / LD10 Slough Campus and 226 other data centers
This page is the public summary. Start a 7-day trial or sign in to see Equinix LD4 / LD5 / LD6 / LD10 Slough Campus on the map with its exact location, every sourced figure and the filings behind it.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Questions
Who operates Equinix LD4 / LD5 / LD6 / LD10 Slough Campus?
Equinix LD4 / LD5 / LD6 / LD10 Slough Campus is recorded under Equinix. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Equinix LD4 / LD5 / LD6 / LD10 Slough Campus?
In Slough, United Kingdom. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Equinix LD4 / LD5 / LD6 / LD10 Slough Campus have?
95 MW, as stated by Equinix. Operating capacity today is not recorded.
Where does this information come from?
From 1 linked page by Equinix. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.