AnalystAIReal Assets Start free trial

← Europe data centers · All sites · Poland

Sourced site record, every fact links to its page

Central Energy Group Konin AI Campus:data center in Konin, Poland.

Central Energy Group Konin AI Campus is a planned data center in Konin, Poland, listed under Central Energy Group. Planned capacity is 260 MW according to Data Center Dynamics. Real Assets links 1 source page, including Data Center Dynamics.

Open this site on the map View permit PDFs & MW timeline
Konin, PolandCentral Energy Group
260 MW

planned data center · 1 linked source

  • Central Energy Group
  • Konin
  • Poland
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Poland peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
260 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorCentral Energy Group
  • City and countryKonin, Poland
  • Statusplanned
  • Planned capacity260 MW, as stated by Data Center Dynamics
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated4 November 2026
  • Exact parcel coordinates & street address🔒 View on parcel map
  • Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
  • Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Poland has 13 data centers on record in Real Assets, with 114 MW reported as operating and 3.66 GW not yet operating. Central Energy Group Konin AI Campus is one of them.

Central Energy Group has 1 data center on record in Europe: 0 operating and 1 planned or under construction.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Central Energy Group Konin AI Campus - enter work email

Unlock the complete facility dossier for Central Energy Group Konin AI Campus (Konin, Poland): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in Poland

Full site dossier & Europe dataset

Unlock Central Energy Group Konin AI Campus permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Central Energy Group Konin AI Campus in Konin, Poland. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Central Energy Group Konin AI Campus
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Central Energy Group in Poland

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Central Energy Group Konin AI Campus?

Central Energy Group Konin AI Campus is recorded under Central Energy Group. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Central Energy Group Konin AI Campus?

In Konin, Poland. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Central Energy Group Konin AI Campus have?

260 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.