← Europe data centers · All comparisons · All operators · Etix Everywhere (17) · atNorth (13)
Head-to-head operator comparison, sourced from primary filings
Etix Everywhere vs atNorth:17 vs 13 data center sites.
As of 23 November 2026, Real Assets tracks 17 data center sites under Etix Everywhere (17 operating, 0 planned) vs 13 under atNorth (5 operating, 8 planned) in Europe. Reported power capacity: Etix Everywhere has 1 MW operating, while atNorth has 27 MW operating, 1.3 GW planned.
Unlock all 30 Etix Everywhere & atNorth sites#4 vs #6 by sites tracked · 17 vs 5 operating
- Etix Everywhere: 17 sites
- atNorth: 13 sites
Mapped Etix Everywhere and atNorth site positions in Europe (exact coordinates require sign-in)
Etix Everywhere vs atNorth: side-by-side summary
| # | Metric | Etix Everywhere | atNorth |
|---|---|---|---|
| 1 | Rank by sites tracked in Europe | #4 of 104 | #6 of 104 |
| 2 | Total sites tracked | 17 (3% of market) | 13 (2% of market) |
| 3 | Operating sites | 17 | 5 |
| 4 | Planned or under construction | 0 | 8 |
| 5 | Power capacity operating | 1 MW | 27 MW |
| 6 | Power capacity planned | not reported | 1.3 GW |
| 7 | Active countries | 2 | 4 |
| 8 | Largest country | France (16) | Finland (5) |
Etix Everywhere & atNorth: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Etix Everywhere and atNorth.
- atNorth (Partners Group) Nordic Sustainable Hyperscale Data Center Portfolio & EUR 1B+ Expansion Report (Annual Report · 2025 · filed 15 June 2025)
Covers atNorth's 10 Nordic data center campuses across Iceland (ICE01 Reykjavik, ICE02 Keflavik, ICE03 Akureyri), Sweden (SWE01 Stockholm, SWE02 Kista, SWE03 Solleftea mega-site), Finland (FIN01 Espoo, FIN02 Helsinki, FIN04 Kouvola 60MW+), and Denmark (DEN01 Odense, DEN02 Varde 250MW).Annual Report ↗ - Unlock all Etix Everywhere and atNorth filings and extracted figures →
More operator comparisons in Europe
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this Etix Everywhere vs atNorth benchmark using the citation or HTML attribution link below.
Plain-text citation:
Etix Everywhere (17 sites: 17 operating, 0 planned) vs atNorth (13 sites: 5 operating, 8 planned) in Europe, as of 23 November 2026. Source: Real Assets (https://realassets.analystai.ai/eu-data-centers/compare/etix-everywhere-vs-atnorth)
HTML attribution link:
<a href="https://realassets.analystai.ai/eu-data-centers/compare/etix-everywhere-vs-atnorth">Etix Everywhere vs atNorth: Europe data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 30 Etix Everywhere and atNorth data center sites in Europe
Compare every Etix Everywhere (17 sites) and atNorth (13 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 23 November 2026; this page was built on 23 November 2026 at 20:46 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Etix Everywhere have compared with atNorth in Europe?
As of 23 November 2026, Etix Everywhere has 17 tracked sites (17 operating and 0 planned or under construction, ranked #4), compared with 13 for atNorth (5 operating and 8 planned or under construction, ranked #6).
Where do Etix Everywhere and atNorth overlap in Europe?
Etix Everywhere and atNorth operate in distinct countries among the sites currently recorded in Europe.
How does reported power capacity compare between Etix Everywhere and atNorth?
Reported power capacity: Etix Everywhere has 1 MW operating, while atNorth has 27 MW operating, 1.3 GW planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Equinix, Digital Realty, Epoch AI, Baxtel, Data Center Dynamics.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data