AnalystAIReal Assets Start the 3-day preview

← Europe data centers · All comparisons · All operators · DATA4 (14) · atNorth (13)

Head-to-head operator comparison, sourced from primary filings

DATA4 vs atNorth:14 vs 13 data center sites.

As of 19 November 2026, Real Assets tracks 14 data center sites under DATA4 (7 operating, 7 planned) vs 13 under atNorth (5 operating, 8 planned) in Europe. Reported power capacity: DATA4 has 630 MW planned, while atNorth has 27 MW operating, 1.6 GW planned.

Unlock all 27 DATA4 & atNorth sites
DATA4 vs atNorthEurope data center
14 vs 13

#4 vs #5 by sites tracked · 7 vs 5 operating

  • DATA4: 14 sites
  • atNorth: 13 sites
🔒Site names, capacity & coordinates locked · Unlock both footprints

Mapped DATA4 and atNorth site positions in Europe (exact coordinates require sign-in)

Instant code or 1-click sign-in:
14 vs 13sites tracked (#4 vs #5)
7 vs 5operating sites
7 vs 8planned or under construction
0shared countries (6 vs 4 active)

DATA4 vs atNorth: side-by-side summary

Head-to-head comparison of DATA4 and atNorth across Europe as of 19 November 2026.
#MetricDATA4atNorth
1Rank by sites tracked in Europe#4 of 101#5 of 101
2Total sites tracked14 (3% of market)13 (3% of market)
3Operating sites75
4Planned or under construction78
5Power capacity operatingnot reported27 MW
6Power capacity planned630 MW1.6 GW
7Active countries64
8Largest countryFrance (4)Finland (5)

Footprint by country: DATA4 vs atNorth

Countries in Europe where DATA4 or atNorth has tracked data center sites.
#CountryDATA4 sitesatNorth sitesCombined
1Finland055
2France404
3Italy303
4Spain303
5Iceland033
6Sweden033
7Poland202
8Denmark022
9Germany101
10Greece101

DATA4 & atNorth: SEC filings, annual reports and disclosed figures

Primary regulatory filings and annual reports on record for DATA4 and atNorth.

Cite or link to this benchmark

Analysts, journalists, and investor relations teams can reference this DATA4 vs atNorth benchmark using the citation or HTML attribution link below.

Plain-text citation:

DATA4 (14 sites: 7 operating, 7 planned) vs atNorth (13 sites: 5 operating, 8 planned) in Europe, as of 19 November 2026. Source: Real Assets (https://realassets.analystai.ai/eu-data-centers/compare/data4-vs-atnorth)

HTML attribution link:

<a href="https://realassets.analystai.ai/eu-data-centers/compare/data4-vs-atnorth">DATA4 vs atNorth: Europe data center benchmark (Real Assets)</a>

Full market dataset & site-level records

Unlock all 27 DATA4 and atNorth data center sites in Europe

Compare every DATA4 (14 sites) and atNorth (13 sites) facility on the interactive map with site-level capacity, status, and primary source filings.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many data center sites does DATA4 have compared with atNorth in Europe?

As of 19 November 2026, DATA4 has 14 tracked sites (7 operating and 7 planned or under construction, ranked #4), compared with 13 for atNorth (5 operating and 8 planned or under construction, ranked #5).

Where do DATA4 and atNorth overlap in Europe?

DATA4 and atNorth operate in distinct countries among the sites currently recorded in Europe.

How does reported power capacity compare between DATA4 and atNorth?

Reported power capacity: DATA4 has 630 MW planned, while atNorth has 27 MW operating, 1.6 GW planned.

Where does the comparison data come from?

Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Equinix, Digital Realty, Epoch AI, Baxtel, Data Center Dynamics.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the data centers data