← Europe data centers · All comparisons · All operators · atNorth (14) · DATA4 (12)
Head-to-head operator comparison, sourced from primary filings
atNorth vs DATA4:14 vs 12 data center sites.
As of 11 November 2026, Real Assets tracks 14 data center sites under atNorth (6 operating, 8 planned) vs 12 under DATA4 (7 operating, 5 planned) in Europe. Reported power capacity: atNorth has 27 MW operating, 1.3 GW planned, while DATA4 has 430 MW operating, 620 MW planned.
Unlock all 26 atNorth & DATA4 sites#4 vs #6 by sites tracked · 6 vs 7 operating
- atNorth: 14 sites
- DATA4: 12 sites
Mapped atNorth and DATA4 site positions in Europe (exact coordinates require sign-in)
atNorth vs DATA4: side-by-side summary
| # | Metric | atNorth | DATA4 |
|---|---|---|---|
| 1 | Rank by sites tracked in Europe | #4 of 110 | #6 of 110 |
| 2 | Total sites tracked | 14 (3% of market) | 12 (2% of market) |
| 3 | Operating sites | 6 | 7 |
| 4 | Planned or under construction | 8 | 5 |
| 5 | Power capacity operating | 27 MW | 430 MW |
| 6 | Power capacity planned | 1.3 GW | 620 MW |
| 7 | Active countries | 4 | 6 |
| 8 | Largest country | Finland (6) | France (3) |
atNorth & DATA4: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for atNorth and DATA4.
- atNorth (Partners Group) Nordic Sustainable Hyperscale Data Center Portfolio & EUR 1B+ Expansion Report (Annual Report · 2025 · filed 15 June 2025)
Covers atNorth's 10 Nordic data center campuses across Iceland (ICE01 Reykjavik, ICE02 Keflavik, ICE03 Akureyri), Sweden (SWE01 Stockholm, SWE02 Kista, SWE03 Solleftea mega-site), Finland (FIN01 Espoo, FIN02 Helsinki, FIN04 Kouvola 60MW+), and Denmark (DEN01 Odense, DEN02 Varde 250MW).Annual Report ↗ - DATA4 Group (Brookfield Infrastructure) EUR 7B European Hyperscale Investment & 1.5 GW Campus Report (Annual Report · 2025 · filed 1 June 2025)
Details DATA4's €7B investment plan through 2030 across 35+ data centers in France (Marcoussis Paris-Saclay, Nozay), Italy (Cornaredo & Vittuone Milan), Spain (Alcobendas & San Agustin del Guadalix Madrid), Poland (Jawczyce Warsaw), Germany (Hanau Grossauheim 180MW), and Greece (Paiania Athens).Annual Report ↗ - Unlock all atNorth and DATA4 filings and extracted figures →
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this atNorth vs DATA4 benchmark using the citation or HTML attribution link below.
Plain-text citation:
atNorth (14 sites: 6 operating, 8 planned) vs DATA4 (12 sites: 7 operating, 5 planned) in Europe, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/eu-data-centers/compare/atnorth-vs-data4)
HTML attribution link:
<a href="https://realassets.analystai.ai/eu-data-centers/compare/atnorth-vs-data4">atNorth vs DATA4: Europe data center benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 26 atNorth and DATA4 data center sites in Europe
Compare every atNorth (14 sites) and DATA4 (12 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does atNorth have compared with DATA4 in Europe?
As of 11 November 2026, atNorth has 14 tracked sites (6 operating and 8 planned or under construction, ranked #4), compared with 12 for DATA4 (7 operating and 5 planned or under construction, ranked #6).
Where do atNorth and DATA4 overlap in Europe?
atNorth and DATA4 operate in distinct countries among the sites currently recorded in Europe.
How does reported power capacity compare between atNorth and DATA4?
Reported power capacity: atNorth has 27 MW operating, 1.3 GW planned, while DATA4 has 430 MW operating, 620 MW planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Equinix, Digital Realty, Epoch AI, Baxtel, Data Center Dynamics.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data