AnalystAIReal Assets Start free trial

← Europe data centers · All comparisons · All operators · atNorth (14) · DATA4 (12)

Head-to-head operator comparison, sourced from primary filings

atNorth vs DATA4:14 vs 12 data center sites.

As of 11 November 2026, Real Assets tracks 14 data center sites under atNorth (6 operating, 8 planned) vs 12 under DATA4 (7 operating, 5 planned) in Europe. Reported power capacity: atNorth has 27 MW operating, 1.3 GW planned, while DATA4 has 430 MW operating, 620 MW planned.

Unlock all 26 atNorth & DATA4 sites
atNorth vs DATA4Europe data center
14 vs 12

#4 vs #6 by sites tracked · 6 vs 7 operating

  • atNorth: 14 sites
  • DATA4: 12 sites
🔒Site names, capacity & coordinates locked · Unlock both footprints

Mapped atNorth and DATA4 site positions in Europe (exact coordinates require sign-in)

Instant code or 1-click sign-in:
14 vs 12sites tracked (#4 vs #6)
6 vs 7operating sites
8 vs 5planned or under construction
0shared countries (4 vs 6 active)

atNorth vs DATA4: side-by-side summary

Head-to-head comparison of atNorth and DATA4 across Europe as of 11 November 2026.
#MetricatNorthDATA4
1Rank by sites tracked in Europe#4 of 110#6 of 110
2Total sites tracked14 (3% of market)12 (2% of market)
3Operating sites67
4Planned or under construction85
5Power capacity operating27 MW430 MW
6Power capacity planned1.3 GW620 MW
7Active countries46
8Largest countryFinland (6)France (3)

Footprint by country: atNorth vs DATA4

Countries in Europe where atNorth or DATA4 has tracked data center sites.
#CountryatNorth sitesDATA4 sitesCombined
1Finland606
2Iceland303
3Sweden303
4France033
5Italy033
6Spain033
7Denmark202
8Germany011
9Greece011
10Poland011

atNorth & DATA4: SEC filings, annual reports and disclosed figures

Primary regulatory filings and annual reports on record for atNorth and DATA4.

Cite or link to this benchmark

Analysts, journalists, and investor relations teams can reference this atNorth vs DATA4 benchmark using the citation or HTML attribution link below.

Plain-text citation:

atNorth (14 sites: 6 operating, 8 planned) vs DATA4 (12 sites: 7 operating, 5 planned) in Europe, as of 11 November 2026. Source: Real Assets (https://realassets.analystai.ai/eu-data-centers/compare/atnorth-vs-data4)

HTML attribution link:

<a href="https://realassets.analystai.ai/eu-data-centers/compare/atnorth-vs-data4">atNorth vs DATA4: Europe data center benchmark (Real Assets)</a>

Full market dataset & site-level records

Unlock all 26 atNorth and DATA4 data center sites in Europe

Compare every atNorth (14 sites) and DATA4 (12 sites) facility on the interactive map with site-level capacity, status, and primary source filings.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many data center sites does atNorth have compared with DATA4 in Europe?

As of 11 November 2026, atNorth has 14 tracked sites (6 operating and 8 planned or under construction, ranked #4), compared with 12 for DATA4 (7 operating and 5 planned or under construction, ranked #6).

Where do atNorth and DATA4 overlap in Europe?

atNorth and DATA4 operate in distinct countries among the sites currently recorded in Europe.

How does reported power capacity compare between atNorth and DATA4?

Reported power capacity: atNorth has 27 MW operating, 1.3 GW planned, while DATA4 has 430 MW operating, 620 MW planned.

Where does the comparison data come from?

Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include Equinix, Digital Realty, Epoch AI, Baxtel, Data Center Dynamics.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the data centers data