European data center capacity and pipeline:2.8 GW operating.
As of 23 November 2026, Real Assets tracks 508 Europe data center sites from 102 named operators. Power capacity across the market: 2.8 GW operating and 14.8 GW not yet operating (of which 3.6 GW under construction and 11.1 GW planned), reported for 206 of 508 sites. United Kingdom has the most sites (95, 804 MW operating and 3.5 GW not yet operating), then Germany (89) and France (64). Digital Realty runs the most (106 sites, 95 operating and 11 planned).
Start the 3-day previewNo password and no card: the 3-day preview shows 20 sites; a subscription opens all 508.
Europe data center sites by country
| Rank | Country | Sites tracked | Share of sites | Power capacity operating | Power capacity not yet operating | Sites with a figure |
|---|---|---|---|---|---|---|
| 1 | United Kingdom | 95 | 19% | 804 MW | 3.5 GW | 56 of 95 |
| 2 | Germany | 89 | 18% | 442 MW | 1.1 GW | 32 of 89 |
| 3 | France | 64 | 13% | 189 MW | 1.4 GW | 19 of 64 |
| 4 | Netherlands | 42 | 8% | 175 MW | 600 MW | 12 of 42 |
| 5 | Spain | 34 | 7% | 135 MW | 400 MW | 16 of 34 |
| 6 | Ireland | 29 | 6% | 58 MW | not reported | 7 of 29 |
| 7 | Finland | 27 | 5% | 77 MW | 935 MW | 11 of 27 |
| 8 | Sweden | 20 | 4% | 123 MW | 1.0 GW | 11 of 20 |
| 9 | Italy | 17 | 3% | 104 MW | 1.1 GW | 6 of 17 |
| 10 | Poland | 15 | 3% | 122 MW | 3.4 GW | 9 of 15 |
Largest Europe data center operators
| Rank | Operator | Sites tracked | Operating sites | Planned sites | Power capacity operating | Power capacity not yet operating |
|---|---|---|---|---|---|---|
| 1 | Digital Realty | 106 | 95 | 11 | 75 MW | 50 MW |
| 2 | Equinix | 86 | 85 | 1 | 38 MW | 250 MW |
| 3 | CyrusOne | 17 | 13 | 4 | 241 MW | 286 MW |
| 4 | DATA4 | 14 | 7 | 7 | not reported | 630 MW |
| 5 | atNorth | 13 | 5 | 8 | 27 MW | 1.3 GW |
| 6 | NTT Global Data Centers | 13 | 13 | 0 | 256 MW | 32 MW |
| 7 | VIRTUS Data Centres | 12 | 10 | 2 | 261 MW | 267 MW |
| 8 | 12 | 8 | 4 | not reported | not reported | |
| 9 | Vantage Data Centers | 10 | 7 | 3 | 167 MW | 520 MW |
| 10 | Colt Data Centre Services | 9 | 4 | 5 | 70 MW | 128 MW |
Primary filings from the largest operators
- Digital Realty: DIGITAL REALTY TRUST, INC. 8-K 2026-10-30: Other Events (8.01)8-K, 30 October 2026
- Equinix: EQUINIX INC 8-K 2026-11-09: Other Events (8.01)8-K, 9 November 2026
- CyrusOne: CyrusOne (KKR & Global Infrastructure Partners) 2025 Sustainability & Global Portfolio ReportAnnual Report, 10 June 2025
- DATA4: DATA4 Group (Brookfield Infrastructure) EUR 7B European Hyperscale Investment & 1.5 GW Campus ReportAnnual Report, 1 June 2025
- atNorth: atNorth (Partners Group) Nordic Sustainable Hyperscale Data Center Portfolio & EUR 1B+ Expansion ReportAnnual Report, 15 June 2025
Site-level records behind this answer
Open every Europe data center site behind these figures
This page answers "European data center capacity and pipeline" from public aggregates. Start the 3-day preview or sign in to see each site, operator and source.
- Every data center site on the interactive map, with its operator and status
- Power capacity by site, operating and not yet operating kept apart
- Sourced deals and filings, with the page behind every figure
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 23 November 2026; this page was built on 23 November 2026 at 08:28 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How much data center power capacity is operating and under construction in Europe?
Power capacity across the market: 2.8 GW operating and 14.8 GW not yet operating (of which 3.6 GW under construction and 11.1 GW planned), reported for 206 of 508 sites. Operating and not yet operating figures are kept apart and never added together. A site with no stated power capacity is not counted as zero.
Which countries have the most Europe data center sites?
United Kingdom: 95 sites (19% of those tracked, 804 MW operating and 3.5 GW not yet operating); Germany: 89 sites (18% of those tracked, 442 MW operating and 1.1 GW not yet operating); France: 64 sites (13% of those tracked, 189 MW operating and 1.4 GW not yet operating). Data updated 23 November 2026.
Who are the largest Europe data center operators?
By sites tracked: Digital Realty (106 sites, 95 operating and 11 planned, 75 MW operating); Equinix (86 sites, 85 operating and 1 planned, 38 MW operating); CyrusOne (17 sites, 13 operating and 4 planned, 241 MW operating). Ranked by sites tracked, not by power capacity.