AnalystAIReal Assets Start the 3-day preview

← Asia-Pacific data centers · All sites · Japan

Sourced site record, every fact links to its page

MC Digital Realty HND10&11:data center in Mitaka, Japan.

MC Digital Realty HND10&11 is an operating data center in Mitaka, Japan, listed under Digital Realty. Capacity is not recorded. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 1 source page, including Digital Realty.

Open this site on the map View the full site record
Mitaka, JapanDigital Realty
Operating

operating data center · 1 linked source

  • Digital Realty
  • Mitaka
  • Japan
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Japan peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
Not recordedcapacity
Operatingstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorDigital Realty
  • City and countryMitaka, Japan
  • Statusoperating
  • CapacityNot recorded
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 12 January 2024 to 12 November 2026
  • Sources linked1 from 1 publisher
  • Record updated17 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Japan has 78 data centers on record in Real Assets, with 675 MW reported as operating and 476 MW not yet operating. MC Digital Realty HND10&11 is one of them.

Digital Realty has 21 data centers on record in Asia-Pacific: 19 operating and 2 planned or under construction. See Digital Realty in Japan (6 sites). Compare Equinix vs Digital Realty.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 13:45 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open MC Digital Realty HND10&11's record: 1 source page - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for MC Digital Realty HND10&11 (12 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All Asia-Pacific 2024 vs 2026 satellite-tracked sites

More Digital Realty data centers in Japan

Digital Realty data centers in other countries

Other data centers in Japan

Full site dossier & Asia-Pacific dataset

Open MC Digital Realty HND10&11 and 703 other data centers

This page is the public summary for MC Digital Realty HND10&11 in Mitaka, Japan. Sign in to see its full record: 1 source page.

  • MC Digital Realty HND10&11 on the interactive map, with the sites around it
  • All 1 linked source page

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates MC Digital Realty HND10&11?

MC Digital Realty HND10&11 is recorded under Digital Realty. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is MC Digital Realty HND10&11?

In Mitaka, Japan. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does MC Digital Realty HND10&11 have?

No capacity figure is recorded for this site. Real Assets does not estimate one.

Is MC Digital Realty HND10&11 under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for MC Digital Realty HND10&11 (12 January 2024 to 12 November 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 1 linked page by Digital Realty. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.