Venture Global LNG:9 LNG and gas infrastructure sites in United States.

As of 19 November 2026, Real Assets tracks 9 LNG and gas infrastructure sites listed under Venture Global LNG in the United States: 4 operating and 5 planned or under construction. Reported baseload liquefaction capacity: 23 Mtpa operating, 14 Mtpa not yet operating. It ranks number 6 by sites among 167 named operators, with 3% of the 307 sites tracked. Largest states: Louisiana (9).

Unlock all 9 Venture Global LNG sites
Venture Global LNGUnited States LNG and gas infrastructure
9

4 operating · 5 planned or under construction · #6 operator

  • Louisiana (9)
🔒Site names, capacity & coordinates locked · Unlock Venture Global LNG map

Mapped Venture Global LNG footprint in United States (site-level details require sign-in)

Instant code or 1-click sign-in:
9sites tracked
4operating
5planned or under construction
#6by sites, of 167 named operators

Where Venture Global LNG is

Largest operators in United States

Locked operator portfolio & primary filings

View all 9 Venture Global LNG LNG and gas infrastructure sites with their sources and sourced figures - enter work email

Unlock the complete Venture Global LNG footprint in the United States (4 operating, 5 planned): exact parcel coordinates, building specifications, M&A/lease deals, and primary source PDFs.

Instant 6-digit code or 1-click work sign-in (no password):

Venture Global LNG by state

Regional breakdown pages where Venture Global LNG has at least 3 tracked LNG and gas infrastructure sites.

Venture Global LNG: SEC filings, annual reports and disclosed figures

Primary regulatory filings and annual reports on record for Venture Global LNG, with disclosed capital expenditure, lease commitments and capacity figures.

  • Quarterly Investor Presentation, 2Q 2026 (Presentation · 2Q 2026 · filed 11 August 2026)
    Venture Global Quarterly Investor Presentation, 2Q 2026 (2Q 2026, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of uncontracted commissioning cargos and excess cargos due to volatility and variability in the LNG markets; our need for significant additional capital to construct and complete our projects, including some of our existing projects, future projects, potential bolt-on expansions and related assets, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals to complete construction during our estimated development periods; significant operational risks related to our natural gas liquefaction and export projects, including our existing projects and any potential bolt-on expansions, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade including the effects of tariffs, as well as the effects of ongoing legal challenges to tariffs and reimbursements of tariffs; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts our potential inability to enter into the necessary contracts to construct our projects, or any bolt-on expansions, on a timely basis or on terms that are acceptable to us; our potential inability to enter into Contracted SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at our existing projects, any potential bolt-on expansions, or any future projects we develop; our dependence on our EPC and other contractors and suppliers for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect the permitting status, timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from geopolitical and inflationary pressures, including from the disruption in international oil and natural gas supply chains caused by the ongoing conflict in Iran and decline in commercial vessel traffic in the Strait of Hormuz; the potential negative impacts of seasonal fluctuations on our business; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a result of opposition by environmental and other public interest groups; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on March 2, 2026, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law. The guidance in this presentation is only effective as of the date given, August 11, 2026.
    Presentation ↗
  • Quarterly Investor Presentation, 1Q 2026 (Presentation · 1Q 2026 · filed 31 March 2026)
    Venture Global Quarterly Investor Presentation, 1Q 2026 (1Q 2026, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of uncontracted commissioning cargos and excess cargos due to volatility and variability in the LNG markets; the impact of the price of natural gas, including potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; our need for significant additional capital to construct and complete future projects and related assets, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals to complete construction during our estimated development periods; significant operational risks related to our natural gas liquefaction and export projects, including our existing projects and any potential bolt-on expansions, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade including the effects of tariffs, 8; our potential inability to enter into the necessary contracts to construct our projects, or any bolt-on expansions, on a timely basis or on terms that are acceptable to us; our potential inability to enter into post-COD SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at our existing projects, any potential bolt-on expansions, or any future projects we develop; our dependence on our EPC and other contractors and suppliers for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect permit status, the timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures, including from the disruption in international oil and gas supply chains caused by the ongoing war in Iran and the closure of the Strait of Hormuz; the potential negative impacts of seasonal fluctuations on our business; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade, including the effects of any current or future tariffs imposed by the U.S. and any current or future tariffs imposed by other countries, including China, on the U.S.; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a results of opposition by environmental and other public interest groups; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on March 2, 2026, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law.
    Presentation ↗
  • Quarterly Investor Presentation, 3Q 2025 (Presentation · 3Q 2025 · filed 10 November 2025)
    Venture Global Quarterly Investor Presentation, 3Q 2025 (3Q 2025, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of commissioning cargos and excess cargos due to volatility and variability in the LNG markets; the impact of the price of natural gas, including potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; our need for significant additional capital to construct and complete some future projects, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals; significant operational risks related to our natural gas liquefaction and export projects, including the Calcasieu Project, the Plaquemines Project, the CP2 Project, the CP3 Project, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; potential delays in the construction of our projects beyond the estimated development periods; our potential inability to enter into the necessary contracts to construct the CP2 Project, or the CP3 Project on a timely basis or on terms that are acceptable to us; our potential inability to enter into post-COD SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at the CP2 Project, the CP3 Project or any future projects we develop; our dependence on our EPC and other contractors for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect the timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a result of opposition by environmental and other public interest groups; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; the potential negative impacts of seasonal fluctuations on our business; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade, including the effects of any current or future tariffs imposed by the U.S. and any current or future tariffs imposed by other countries, including China, on the U.S.; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on March 6, 2025, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law.
    Presentation ↗
  • Venture Global LNG Q3 2026 earnings call transcript (Earnings call transcript · Q3 2026 · filed 10 November 2026)Earnings call transcript ↗
  • Venture Global LNG Q2 2026 earnings call transcript (Earnings call transcript · Q2 2026 · filed 18 August 2026)Earnings call transcript ↗
  • Venture Global LNG Q1 2026 earnings call transcript (Earnings call transcript · Q1 2026 · filed 12 May 2026)Earnings call transcript ↗
  • Unlock all Venture Global LNG filings and extracted figures →

Full market dataset & site-level records

Unlock all 9 Venture Global LNG LNG and gas infrastructure sites in the United States

This page previews Venture Global LNG's top footprint. Sign in or start the 3-day preview to inspect all 9 individual Venture Global LNG facilities, site-by-site capacity, status, and source filings.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
  • Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in

or continue in one click

Instant sign-in with a 6-digit email code or single sign-on. No password required.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

How this data is built

Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

How this data is built and what a source line means

Questions

How many LNG and gas infrastructure sites does Venture Global LNG have in the United States?

9 tracked as of 19 November 2026: 4 operating and 5 planned or under construction. This is what we have recorded, not a full census.

Where are Venture Global LNG's LNG and gas infrastructure sites?

Largest states by sites: Louisiana (9).

How much baseload liquefaction capacity does Venture Global LNG have?

Reported baseload liquefaction capacity: 23 Mtpa operating, 14 Mtpa not yet operating.

How does Venture Global LNG compare with other LNG and gas infrastructure operators?

It ranks number 6 of the 65 largest named operators by sites tracked. The largest is Energy Transfer with 17.

Where does the data come from?

Figures link to the page that published them. Publishers behind this market's data include SEC EDGAR, Kinder Morgan, Cheniere Energy.

See every site, operator and source

This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.

Open the LNG and gas infrastructure data