← United States LNG and gas infrastructure · All comparisons · All operators · Cheniere Energy (9) · Venture Global LNG (9)
Head-to-head operator comparison, sourced from primary filings
Cheniere Energy vs Venture Global LNG:9 vs 9 LNG and gas infrastructure sites.
As of 19 November 2026, Real Assets tracks 9 LNG and gas infrastructure sites under Cheniere Energy (7 operating, 2 planned) vs 9 under Venture Global LNG (4 operating, 5 planned) in the United States. Reported baseload liquefaction capacity: Cheniere Energy has 55 Mtpa operating, 3 Mtpa planned, while Venture Global LNG has 23 Mtpa operating, 14 Mtpa planned. Both operators overlap in 1 states, led by Louisiana (3 vs 9).
Unlock all 18 Cheniere Energy & Venture Global LNG sites#5 vs #6 by sites tracked · 7 vs 4 operating
- Cheniere Energy: 9 sites
- Venture Global LNG: 9 sites
- 1 shared states
Mapped Cheniere Energy and Venture Global LNG site positions in United States (exact coordinates require sign-in)
Cheniere Energy vs Venture Global LNG: side-by-side summary
| # | Metric | Cheniere Energy | Venture Global LNG |
|---|---|---|---|
| 1 | Rank by sites tracked in United States | #5 of 167 | #6 of 167 |
| 2 | Total sites tracked | 9 (3% of market) | 9 (3% of market) |
| 3 | Operating sites | 7 | 4 |
| 4 | Planned or under construction | 2 | 5 |
| 5 | Baseload liquefaction capacity operating | 55 Mtpa | 23 Mtpa |
| 6 | Baseload liquefaction capacity planned | 3 Mtpa | 14 Mtpa |
| 7 | Active states | 3 | 1 |
| 8 | Largest state | Texas (5) | Louisiana (9) |
Cheniere Energy & Venture Global LNG: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Cheniere Energy and Venture Global LNG.
- 1Q 2026 Earnings Presentation (8-K / Earnings Release · 1Q 2026 · filed 7 May 2026)
Cheniere Energy 1Q 2026 Earnings Presentation (1Q 2026, Europe / EMEA): Forward-Looking Statements This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements, other than statements of historical or present facts or conditions, included or incorporated by reference herein are “forward- looking statements.” Included among “forward-looking statements” are, among other things: • statements regarding the ability of Cheniere Energy Partners, L.P. to pay or increase distributions to its unitholders or Cheniere Energy, Inc. to pay or increase dividends to its shareholders or participate in share or unit buybacks; • statements regarding Cheniere Energy, Inc.’s or Cheniere Energy Partners, L.P.’s expected receipt of cash distributions from their respective subsidiaries; • statements that Cheniere Energy Partners, L.P. expects to commence or complete construction of its proposed liquefied natural gas (“LNG”) terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates or at all; • statements that Cheniere Energy, Inc. expects to commence or complete construction of its proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates or at all; • statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide, or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure, or demand for and prices related to natural gas, LNG or other hydrocarbon products; • statements regarding any financing transactions or arrangements, or ability to enter into such transactions; • statements relating to Cheniere’s capital deployment, including intent, ability, extent, and timing of capital expenditures, debt repayment, dividends, share repurchases and execution on the capital allocation plan; • statements regarding our future sources of liquidity and cash requirements; • statements relating to the construction of our proposed liquefaction facilities and natural gas liquefaction trains (“Trains”) and the construction of our pipelines, including statements concerning the engagement of any engineering, procurement and construction ("EPC") contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto; • statements regarding any agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas, liquefaction or storage capacities that are, or may become, subject to contracts; • statements regarding counterparties to our commercial contracts, construction contracts and other contracts; • statements regarding our planned development and construction of additional Trains or pipelines, including the financing of such Trains or pipelines; • statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities; • statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs, free cash flow, run rate SG&A estimates, cash flows, EBITDA, Consolidated Adjusted EBITDA, distributable cash flow, distributable cash flow per share and unit, deconsolidated debt outstanding, and deconsolidated contracted EBITDA, any or all of which are subject to change; • statements regarding projections of revenues, expenses, earnings or losses, working capital or other financial items; • statements relating to our goals, commitments and strategies in relation to environmental matters; • statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions; • statements regarding our anticipated LNG and natural gas marketing activities; and • any other statements that relate to non-historical or future information. These forward-looking statements are often identified by the use of terms and phrases such as “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “could,” “develop,” “estimate,” “example,” “expect,” “forecast,” “goals,” ”guidance,” “intend,” “may,” “opportunities,” “plan,” “potential,” “predict,” “project,” “propose,” “pursue,” “should,” “subject to,” “strategy,” “target,” “will,” and similar terms and phrases, or by use of future tense. Although we believe that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect.8-K / Earnings Release ↗ - 4Q and Full Year 2025 Earnings Presentation (8-K / Earnings Release · Full Year 2025 · filed 26 February 2026)
Cheniere Energy 4Q and Full Year 2025 Earnings Presentation (Full Year 2025, Europe / EMEA): Forward-Looking Statements This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements, other than statements of historical or present facts or conditions, included or incorporated by reference herein are “forward- looking statements.” Included among “forward-looking statements” are, among other things: • statements regarding the ability of Cheniere Energy Partners, L.P. to pay or increase distributions to its unitholders or Cheniere Energy, Inc. to pay or increase dividends to its shareholders or participate in share or unit buybacks; • statements regarding Cheniere Energy, Inc.’s or Cheniere Energy Partners, L.P.’s expected receipt of cash distributions from their respective subsidiaries; • statements that Cheniere Energy Partners, L.P. expects to commence or complete construction of its proposed liquefied natural gas (“LNG”) terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates or at all; • statements that Cheniere Energy, Inc. expects to commence or complete construction of its proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates or at all; • statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide, or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure, or demand for and prices related to natural gas, LNG or other hydrocarbon products; • statements regarding any financing transactions or arrangements, or ability to enter into such transactions; • statements relating to Cheniere’s capital deployment, including intent, ability, extent, and timing of capital expenditures, debt repayment, dividends, share repurchases and execution on the capital allocation plan; • statements regarding our future sources of liquidity and cash requirements; • statements relating to the construction of our proposed liquefaction facilities and natural gas liquefaction trains (“Trains”) and the construction of our pipelines, including statements concerning the engagement of any engineering, procurement and construction ("EPC") contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto; • statements regarding any agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas, liquefaction or storage capacities that are, or may become, subject to contracts; • statements regarding counterparties to our commercial contracts, construction contracts and other contracts; • statements regarding our planned development and construction of additional Trains or pipelines, including the financing of such Trains or pipelines; • statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities; • statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs, free cash flow, run rate SG&A estimates, cash flows, EBITDA, Consolidated Adjusted EBITDA, distributable cash flow, distributable cash flow per share and unit, deconsolidated debt outstanding, and deconsolidated contracted EBITDA, any or all of which are subject to change; • statements regarding projections of revenues, expenses, earnings or losses, working capital or other financial items; • statements relating to our goals, commitments and strategies in relation to environmental matters; • statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions; • statements regarding our anticipated LNG and natural gas marketing activities; and • any other statements that relate to non-historical or future information. These forward-looking statements are often identified by the use of terms and phrases such as “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “could,” “develop,” “estimate,” “example,” “expect,” “forecast,” “goals,” ”guidance,” “intend,” “may,” “opportunities,” “plan,” “potential,” “predict,” “project,” “propose,” “pursue,” “should,” “subject to,” “strategy,” “target,” “will,” and similar terms and phrases, or by use of future tense. Although we believe that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect.8-K / Earnings Release ↗ - Cheniere Energy Q3 2026 earnings call transcript (Earnings call transcript · Q3 2026 · filed 29 October 2026)Earnings call transcript ↗
- Cheniere Energy Q2 2026 earnings call transcript (Earnings call transcript · Q2 2026 · filed 13 August 2026)Earnings call transcript ↗
- Cheniere Energy Q1 2026 earnings call transcript (Earnings call transcript · Q1 2026 · filed 7 May 2026)Earnings call transcript ↗
- Cheniere Energy Q4 2025 earnings call transcript (Earnings call transcript · Q4 2025 · filed 26 February 2026)Earnings call transcript ↗
- Quarterly Investor Presentation, 2Q 2026 (Presentation · 2Q 2026 · filed 11 August 2026)
Venture Global Quarterly Investor Presentation, 2Q 2026 (2Q 2026, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of uncontracted commissioning cargos and excess cargos due to volatility and variability in the LNG markets; our need for significant additional capital to construct and complete our projects, including some of our existing projects, future projects, potential bolt-on expansions and related assets, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals to complete construction during our estimated development periods; significant operational risks related to our natural gas liquefaction and export projects, including our existing projects and any potential bolt-on expansions, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade including the effects of tariffs, as well as the effects of ongoing legal challenges to tariffs and reimbursements of tariffs; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts our potential inability to enter into the necessary contracts to construct our projects, or any bolt-on expansions, on a timely basis or on terms that are acceptable to us; our potential inability to enter into Contracted SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at our existing projects, any potential bolt-on expansions, or any future projects we develop; our dependence on our EPC and other contractors and suppliers for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect the permitting status, timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from geopolitical and inflationary pressures, including from the disruption in international oil and natural gas supply chains caused by the ongoing conflict in Iran and decline in commercial vessel traffic in the Strait of Hormuz; the potential negative impacts of seasonal fluctuations on our business; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a result of opposition by environmental and other public interest groups; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on March 2, 2026, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law. The guidance in this presentation is only effective as of the date given, August 11, 2026.Presentation ↗ - Quarterly Investor Presentation, 1Q 2026 (Presentation · 1Q 2026 · filed 31 March 2026)
Venture Global Quarterly Investor Presentation, 1Q 2026 (1Q 2026, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of uncontracted commissioning cargos and excess cargos due to volatility and variability in the LNG markets; the impact of the price of natural gas, including potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; our need for significant additional capital to construct and complete future projects and related assets, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals to complete construction during our estimated development periods; significant operational risks related to our natural gas liquefaction and export projects, including our existing projects and any potential bolt-on expansions, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade including the effects of tariffs, 8; our potential inability to enter into the necessary contracts to construct our projects, or any bolt-on expansions, on a timely basis or on terms that are acceptable to us; our potential inability to enter into post-COD SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at our existing projects, any potential bolt-on expansions, or any future projects we develop; our dependence on our EPC and other contractors and suppliers for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect permit status, the timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures, including from the disruption in international oil and gas supply chains caused by the ongoing war in Iran and the closure of the Strait of Hormuz; the potential negative impacts of seasonal fluctuations on our business; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade, including the effects of any current or future tariffs imposed by the U.S. and any current or future tariffs imposed by other countries, including China, on the U.S.; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a results of opposition by environmental and other public interest groups; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on March 2, 2026, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law.Presentation ↗ - Quarterly Investor Presentation, 3Q 2025 (Presentation · 3Q 2025 · filed 10 November 2025)
Venture Global Quarterly Investor Presentation, 3Q 2025 (3Q 2025, Global): LEGAL DISCLAIMER Forward-Looking Statements This presentation includes statements that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 (as amended, the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934 (as amended, the “Exchange Act”). All statements, other than statements of historical facts, included herein are “forward-looking statements.” In some cases, forward-looking statements can be identified by terminology such as “may,” “might,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. These forward-looking statements, which are subject to risks, uncertainties and assumptions about us, may include projections of our future financial performance, expectations regarding the permitting and regulatory filings, development, construction, commissioning and completion of our projects, expectations regarding sales of LNG cargos, estimates of the cost of our projects and schedule to construct and commission our projects, our anticipated growth strategies and anticipated trends impacting our business. These statements are only predictions based on our current expectations and projections about future events. There are important factors that could cause our actual results, level of activity, performance or achievements to differ materially from the results, level of activity, performance or achievements expressed or implied by the forward-looking statements, including: our potential inability to maintain profitability, maintain positive operating cash flow and ensure adequate liquidity in the future, including as a result of the significant uncertainty in our ability to generate proceeds and the amount of proceeds that will regularly be received from sales of commissioning cargos and excess cargos due to volatility and variability in the LNG markets; the impact of the price of natural gas, including potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; our need for significant additional capital to construct and complete some future projects, and our potential inability to secure such financing on acceptable terms, or at all; our potential inability to construct or operate all of our proposed LNG facilities or pipelines or any additional LNG facilities or pipelines beyond those currently planned, including any of the bolt-on expansion opportunities which we have identified, and to produce LNG in excess of our nameplate capacity, which could limit our growth prospects, including as a result of delays in obtaining regulatory approvals or inability to obtain requisite regulatory approvals; significant operational risks related to our natural gas liquefaction and export projects, including the Calcasieu Project, the Plaquemines Project, the CP2 Project, the CP3 Project, any future projects we develop, our pipelines, our LNG tankers, and our regasification terminal usage rights; our potential inability to accurately estimate costs for our projects, and the risk that the construction and operations of natural gas pipelines and pipeline connections for our projects suffer cost overruns and delays related to obtaining regulatory approvals, development risks, labor costs, unavailability of skilled workers, operational hazards and other risks; potential delays in the construction of our projects beyond the estimated development periods; our potential inability to enter into the necessary contracts to construct the CP2 Project, or the CP3 Project on a timely basis or on terms that are acceptable to us; our potential inability to enter into post-COD SPAs with customers for, or to otherwise sell, an adequate portion of the total expected nameplate capacity at the CP2 Project, the CP3 Project or any future projects we develop; our dependence on our EPC and other contractors for the successful completion of our projects and delivery of our LNG tankers, including the potential inability of our contractors to perform their obligations under their contracts; various economic and political factors, including opposition by environmental or other public interest groups, or the lack of local government and community support required for our projects, which could negatively affect the timing or overall development, construction and operation of our projects; the effects of FERC regulation on our interstate natural gas pipelines and their FERC gas tariffs; our potential inability to obtain, maintain or comply with necessary permits or approvals from governmental and regulatory agencies on which the construction of our projects depends, including as a result of opposition by environmental and other public interest groups; the risk that the natural gas liquefaction system and mid-scale design we utilize at our projects will not achieve the level of performance or other benefits that we anticipate; potential additional risks arising from the duration of and the phased commissioning start-up of our projects; the potential risk that our customers or we may terminate our SPAs if certain conditions are not met or for other reasons; potential decreases in the price of natural gas and its related impact on our ability to pay the cost of gas transportation, the payment of a premium by us for feed gas relative to the contractual price we charge our customers, or other impacts to the price of natural gas resulting from inflationary pressures; the potential negative impacts of seasonal fluctuations on our business; our current and potential involvement in disputes and legal proceedings, including the arbitrations and other proceedings currently pending against us and the possibility and magnitude of negative outcomes in any such dispute or proceeding and the potential impact thereof on our results of operations, liquidity and our existing contracts; the risks related to the development and/or contracting for additional gas transportation capacity to support the operation and expansion capacity of our LNG projects; the risks related to the management and operation of our LNG tanker fleet and our future regasification terminal usage rights; the uncertainty regarding the future of international trade agreements and the United States’ position on international trade, including the effects of any current or future tariffs imposed by the U.S. and any current or future tariffs imposed by other countries, including China, on the U.S.; the potential effects of existing and future environmental and similar laws and governmental regulations on compliance costs, operating and/or construction costs and restrictions; our indebtedness levels, and the fact that we may be able to incur substantially more indebtedness, which may increase the risks created by our substantial indebtedness. For more information on these and other factors that could cause our results to differ materially from expected results, please refer to the risks and uncertainties discussed in our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on March 6, 2025, as such factors may be updated from time to time in our periodic filings with the SEC, which are accessible on the SEC’s website at www.sec.gov. The forward-looking statements included in this presentation are made only as of the date of this presentation, and we undertake no obligation to publicly update or review any forward-looking statement, whether as a result of new information, future developments or otherwise, except as required by law.Presentation ↗ - Venture Global LNG Q3 2026 earnings call transcript (Earnings call transcript · Q3 2026 · filed 10 November 2026)Earnings call transcript ↗
- Venture Global LNG Q2 2026 earnings call transcript (Earnings call transcript · Q2 2026 · filed 18 August 2026)Earnings call transcript ↗
- Venture Global LNG Q1 2026 earnings call transcript (Earnings call transcript · Q1 2026 · filed 12 May 2026)Earnings call transcript ↗
- Unlock all Cheniere Energy and Venture Global LNG filings and extracted figures →
More operator comparisons in United States
- Energy Transfer vs Cheniere Energy (17 vs 9)
- Energy Transfer vs Venture Global LNG (17 vs 9)
- Kinder Morgan vs Cheniere Energy (17 vs 9)
- Kinder Morgan vs Venture Global LNG (17 vs 9)
- Williams Companies vs Cheniere Energy (12 vs 9)
- Williams Companies vs Venture Global LNG (12 vs 9)
- Enbridge vs Cheniere Energy (12 vs 9)
- Enbridge vs Venture Global LNG (12 vs 9)
Cite or link to this benchmark
Analysts, journalists, and investor relations teams can reference this Cheniere Energy vs Venture Global LNG benchmark using the citation or HTML attribution link below.
Plain-text citation:
Cheniere Energy (9 sites: 7 operating, 2 planned) vs Venture Global LNG (9 sites: 4 operating, 5 planned) in the United States, as of 19 November 2026. Source: Real Assets (https://realassets.analystai.ai/us-lng/compare/cheniere-energy-vs-venture-global-lng)
HTML attribution link:
<a href="https://realassets.analystai.ai/us-lng/compare/cheniere-energy-vs-venture-global-lng">Cheniere Energy vs Venture Global LNG: United States LNG and gas infrastructure benchmark (Real Assets)</a>
Full market dataset & site-level records
Unlock all 18 Cheniere Energy and Venture Global LNG LNG and gas infrastructure sites in the United States
Compare every Cheniere Energy (9 sites) and Venture Global LNG (9 sites) facility on the interactive map with site-level capacity, status, and primary source filings.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
Instant sign-in with a 6-digit email code or single sign-on. No password required.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many LNG and gas infrastructure sites does Cheniere Energy have compared with Venture Global LNG in the United States?
As of 19 November 2026, Cheniere Energy has 9 tracked sites (7 operating and 2 planned or under construction, ranked #5), compared with 9 for Venture Global LNG (4 operating and 5 planned or under construction, ranked #6).
Where do Cheniere Energy and Venture Global LNG overlap in the United States?
Cheniere Energy and Venture Global LNG both have tracked sites in 1 states: Louisiana (3 vs 9).
How does reported baseload liquefaction capacity compare between Cheniere Energy and Venture Global LNG?
Reported baseload liquefaction capacity: Cheniere Energy has 55 Mtpa operating, 3 Mtpa planned, while Venture Global LNG has 23 Mtpa operating, 14 Mtpa planned.
Where does the comparison data come from?
Every site and capacity figure links to the primary filing, company page or report that published it. Publishers behind this market's data include SEC EDGAR, Kinder Morgan, Cheniere Energy.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the LNG and gas infrastructure data