← United States data centers · All sites
Sourced site record, every fact links to its page
Valara data center:data center in Spartanburg, South Carolina.
Valara data center is an under construction data center in Spartanburg, South Carolina, listed under Valara Holdings LLC. Planned capacity is 457 MW according to South Carolina Public Radio. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 3 source pages, including South Carolina Public Radio, https://www.foxcarolina.com.
Open this site on the map View the full site recordunder construction data center · 3 linked sources
- Valara Holdings LLC
- Spartanburg
- South Carolina
Approximate position and South Carolina peer sites (the exact position needs sign-in)
Facts on record
- OperatorValara Holdings LLC
- City and stateSpartanburg, South Carolina
- Statusunder construction
- Planned capacity457 MW, as stated by South Carolina Public Radio
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 11 January 2024 to 16 November 2026
- Sources linked3 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Deals recorded on this site🔒 1 deal
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 9 data centers in South Carolina that have a page.
Valara Holdings LLC has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Spartanburg OKs three data center deals at election day meeting | South Carolina Public Radio
South Carolina Public Radio, southcarolinapublicradio.org, published 5 November 2026Web page - Spartanburg County Council passes data center moratorium with several amendments
https://www.foxcarolina.com, foxcarolina.com, published 22 September 2026Web page - 1 additional source filing & extracted fact citations for Valara data center
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for Valara data center (11 January 2024 to 16 November 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
Other data centers in South Carolina
- Savannah River Site
Aiken, South Carolina, planned1 GW - Cielo Digital Gaffney
Gaffney, South Carolina, planned300 MW - DC BLOX: Camp Hall
Berkeley, South Carolina, planned180 MW - Meta Aiken
Trenton, South Carolina, operating168 MW - DC BLOX Greenville
Greenville, South Carolina, operatingNot recorded - Google Berkeley & Dorchester County Mega-Campus
Goose Creek, South Carolina, operatingNot recorded
Full site dossier & United States dataset
Open Valara data center and 1,276 other data centers
This page is the public summary for Valara data center in Spartanburg, South Carolina. Sign in to see its full record: 3 source pages and 1 recorded deal.
- Valara data center on the interactive map, with the sites around it
- All 3 linked source pages
- 1 recorded deal on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Valara data center?
Valara data center is recorded under Valara Holdings LLC. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Valara data center?
In Spartanburg, South Carolina. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Valara data center have?
457 MW, as stated by South Carolina Public Radio. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Valara data center under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for Valara data center (11 January 2024 to 16 November 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 3 linked pages by South Carolina Public Radio, https://www.foxcarolina.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.