Unified Parkway data center campus site:data center in Sutton, Massachusetts.
Unified Parkway data center campus site is a planned data center in Sutton, Massachusetts, listed under The Kraft Group. Planned capacity is 900 MW. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 2 source pages, including baxtel.com, datacenterdynamics.com.
Open this site on the map View the full site recordplanned data center · 2 linked sources
- The Kraft Group
- Sutton
- Massachusetts
Approximate position and Massachusetts peer sites (the exact position needs sign-in)
Facts on record
- OperatorThe Kraft Group
- City and stateSutton, Massachusetts
- Statusplanned
- Planned capacity900 MW
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 8 February 2024 to 19 November 2026
- Sources linked2 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Deals recorded on this site🔒 2 deals
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Real Assets records 17 data centers in Massachusetts that have a page.
The Kraft Group has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Kraft Group Proposes 900MW, $16B Data Center Campus in Sutton, Massachusetts
baxtel.com, published 10 November 2026Web page - Kraft Group could build 900MW data center campus in Sutton, Massachusetts, investing $16 billion - DCD
datacenterdynamics.comWeb page
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Unified Parkway data center campus site's record: 2 source pages and 2 recorded deals - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for Unified Parkway data center campus site (8 February 2024 to 19 November 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
Other data centers in Massachusetts
- Boston 115 Second Avenue
Waltham, Massachusetts, operatingNot recorded - Boston BOS13
Bedford, Massachusetts, operatingNot recorded - Boston BOS14
Needham, Massachusetts, operatingNot recorded - Boston BOS16
Needham, Massachusetts, operatingNot recorded - Centersquare Waltham BO3
Boston, Massachusetts, operatingNot recorded - Centersquare Waltham BOS1
Boston, Massachusetts, operatingNot recorded
Full site dossier & United States dataset
Open Unified Parkway data center campus site and 1,276 other data centers
This page is the public summary for Unified Parkway data center campus site in Sutton, Massachusetts. Sign in to see its full record: 2 source pages and 2 recorded deals.
- Unified Parkway data center campus site on the interactive map, with the sites around it
- All 2 linked source pages
- 2 recorded deals on this site
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Unified Parkway data center campus site?
Unified Parkway data center campus site is recorded under The Kraft Group. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Unified Parkway data center campus site?
In Sutton, Massachusetts. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Unified Parkway data center campus site have?
900 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Unified Parkway data center campus site under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for Unified Parkway data center campus site (8 February 2024 to 19 November 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 2 linked pages by baxtel.com, datacenterdynamics.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.