Unified Parkway data center campus site:data center in Sutton, Massachusetts.

Unified Parkway data center campus site is a planned data center in Sutton, Massachusetts, listed under The Kraft Group. Planned capacity is 900 MW. 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 2 source pages, including baxtel.com, datacenterdynamics.com.

Open this site on the map View the full site record
Sutton, MassachusettsThe Kraft Group
900 MW

planned data center · 2 linked sources

  • The Kraft Group
  • Sutton
  • Massachusetts
🔒Exact position and neighboring pins after sign-in · Open the interactive map

Approximate position and Massachusetts peer sites (the exact position needs sign-in)

Instant code or 1-click sign-in:
900 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorThe Kraft Group
  • City and stateSutton, Massachusetts
  • Statusplanned
  • Planned capacity900 MW
  • Expected completionNot recorded
  • 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 8 February 2024 to 19 November 2026
  • Sources linked2 from 2 publishers
  • Record updated20 November 2026
  • 2024 vs 2026 satellite curtain slider🔒 Compare before and after
  • Exact location on the map🔒 View on the map
  • Deals recorded on this site🔒 2 deals

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 17 data centers in Massachusetts that have a page.

The Kraft Group has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

The full site record

Open Unified Parkway data center campus site's record: 2 source pages and 2 recorded deals - enter work email

Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.

Instant 6-digit code or 1-click work sign-in (no password):

2024 vs 2026 satellite construction check

Dated 10 m satellite passes are stored for Unified Parkway data center campus site (8 February 2024 to 19 November 2026) for before-and-after comparison in the workspace.

Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites

Other data centers in Massachusetts

Full site dossier & United States dataset

Open Unified Parkway data center campus site and 1,276 other data centers

This page is the public summary for Unified Parkway data center campus site in Sutton, Massachusetts. Sign in to see its full record: 2 source pages and 2 recorded deals.

  • Unified Parkway data center campus site on the interactive map, with the sites around it
  • All 2 linked source pages
  • 2 recorded deals on this site

or continue in one click

A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.

Free weekly market briefing

Not ready for the preview? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Unified Parkway data center campus site?

Unified Parkway data center campus site is recorded under The Kraft Group. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Unified Parkway data center campus site?

In Sutton, Massachusetts. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Unified Parkway data center campus site have?

900 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Is Unified Parkway data center campus site under construction or growing on satellite imagery?

Dated 10 m satellite passes are stored for Unified Parkway data center campus site (8 February 2024 to 19 November 2026) for before-and-after comparison in the workspace.

Where does this information come from?

From 2 linked pages by baxtel.com, datacenterdynamics.com. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.