← United States data centers · All sites · New York
Sourced site record, every fact links to its page
Turin Hoefler Avenue Ilion:data center in Ilion, New York.
Turin Hoefler Avenue Ilion is a planned data center in Ilion, New York, listed under Turin Hoefler Avenue LLC. Planned capacity is 200 MW according to NY State Department of Environmental Conservation (BCP application C622036C). 2024 to 2026 satellite: 2024 vs 2026 imagery. Real Assets links 2 source pages, including Data Center Dynamics, NY State Department of Environmental Conservation (BCP application C622036C).
Open this site on the map View the full site recordplanned data center · 2 linked sources
- Turin Hoefler Avenue LLC
- Ilion
- New York
Approximate position and New York peer sites (the exact position needs sign-in)
Facts on record
- OperatorTurin Hoefler Avenue LLC
- City and stateIlion, New York
- Statusplanned
- Planned capacity200 MW, as stated by NY State Department of Environmental Conservation (BCP application C622036C)
- Expected completionNot recorded
- 2024 vs 2026 satelliteDated 2024 and 2026 passes, (2024 to 2026), 24 February 2024 to 21 October 2026
- Sources linked2 from 2 publishers
- Record updated20 November 2026
- 2024 vs 2026 satellite curtain slider🔒 Compare before and after
- Exact location on the map🔒 View on the map
- Sourced figures, each with its page and quote🔒 5 figures
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
New York has 28 data centers on record in Real Assets, with 980 MW reported as operating and 1.85 GW not yet operating. Turin Hoefler Avenue Ilion is one of them.
Turin Hoefler Avenue LLC has 1 data center in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 19 November 2026; this page was built on 22 November 2026 at 12:21 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Former Remington gun factory in New York set to become 200MW data center
Data Center Dynamics, datacenterdynamics.com, published 20 April 2026Web page - extapps.dec.ny.gov
NY State Department of Environmental Conservation (BCP application C622036C), extapps.dec.ny.gov, published 12 January 2026Web page
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
The full site record
Open Turin Hoefler Avenue Ilion's record: 2 source pages and 5 sourced figures - enter work email
Sign in to see where it sits on the map, every source page and each figure with the page and quote it comes from.
2024 vs 2026 satellite construction check
Dated 10 m satellite passes are stored for Turin Hoefler Avenue Ilion (24 February 2024 to 21 October 2026) for before-and-after comparison in the workspace.
Open 2024 vs 2026 satellite slider · All United States 2024 vs 2026 satellite-tracked sites
Other data centers in New York
- Lake Mariner - CB-3, CB-4 & CB-5
Barker, New York, operating360 MW - Cayuga
Lansing, New York, planned320 MW - RITC Data Center
Tonawanda Town, New York, planned300 MW - Stream DC Genesee County
Alabama, New York, planned250 MW - Niagara Digital Campus
Niagara Falls, New York, planned140 MW - SDC Manhattan
New York, New York, operating18 MW
Full site dossier & United States dataset
Open Turin Hoefler Avenue Ilion and 1,276 other data centers
This page is the public summary for Turin Hoefler Avenue Ilion in Ilion, New York. Sign in to see its full record: 2 source pages and 5 sourced figures.
- Turin Hoefler Avenue Ilion on the interactive map, with the sites around it
- All 2 linked source pages
- 5 sourced figures, each with its page and quote
A subscription opens full site-level data; the 3-day preview shows 20 sites. Instant sign-in with no password.
Free weekly market briefing
Not ready for the preview? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Turin Hoefler Avenue Ilion?
Turin Hoefler Avenue Ilion is recorded under Turin Hoefler Avenue LLC. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Turin Hoefler Avenue Ilion?
In Ilion, New York. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Turin Hoefler Avenue Ilion have?
200 MW, as stated by NY State Department of Environmental Conservation (BCP application C622036C). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Is Turin Hoefler Avenue Ilion under construction or growing on satellite imagery?
Dated 10 m satellite passes are stored for Turin Hoefler Avenue Ilion (24 February 2024 to 21 October 2026) for before-and-after comparison in the workspace.
Where does this information come from?
From 2 linked pages by Data Center Dynamics, NY State Department of Environmental Conservation (BCP application C622036C). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.