AnalystAIReal Assets Start free trial

← United States data centers · All sites · Texas

Sourced site record, every fact links to its page

Rowan Digital Infrastructure Project Temple:data center in Temple / Bell County, Texas.

Rowan Digital Infrastructure Project Temple is an under construction data center in Temple / Bell County, Texas, listed under Rowan Digital Infrastructure. Planned capacity is 300 MW according to Baxtel. Real Assets links 1 source page, including Baxtel.

Open this site on the map Start a 7-day trial
300 MWplanned capacity
Under constructionstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorRowan Digital Infrastructure
  • City and stateTemple / Bell County, Texas
  • Statusunder construction
  • Planned capacity300 MW, as stated by Baxtel
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. Rowan Digital Infrastructure Project Temple is one of them.

Rowan Digital Infrastructure has 2 data centers in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

1 source on record. The links open the original pages, not copies. How the data is built and what a source line means.

More Rowan Digital Infrastructure data centers in Texas

Other data centers in Texas

Full market dataset & site-level records

Open Rowan Digital Infrastructure Project Temple and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Rowan Digital Infrastructure Project Temple on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Rowan Digital Infrastructure Project Temple?

Rowan Digital Infrastructure Project Temple is recorded under Rowan Digital Infrastructure. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Rowan Digital Infrastructure Project Temple?

In Temple / Bell County, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Rowan Digital Infrastructure Project Temple have?

300 MW, as stated by Baxtel. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.