Polaris Forge 1, Ellendale:data center in Ellendale, North Dakota.

Polaris Forge 1, Ellendale is a planned data center in Ellendale, North Dakota, listed under Macquarie Asset Management. Planned capacity is 400 MW according to Applied Digital (SEC 8-K Ex. 99.1). Real Assets links 1 source page, including Applied Digital (SEC 8-K Ex. 99.1).

Open this site on the map View permit PDFs & MW timeline
Ellendale, North DakotaMacquarie Asset Management
400 MW

planned data center · 1 linked source

  • Macquarie Asset Management
  • Ellendale
  • North Dakota
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & North Dakota peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
400 MWplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

  • OperatorMacquarie Asset Management
  • City and stateEllendale, North Dakota
  • Statusplanned
  • Planned capacity400 MW, as stated by Applied Digital (SEC 8-K Ex. 99.1)
  • Expected completionNot recorded
  • Sources linked1 from 1 publisher
  • Record updated11 November 2026
  • Exact parcel coordinates & street address🔒 View on parcel map
  • Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
  • Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Real Assets records 12 data centers in North Dakota that have a page.

Macquarie Asset Management has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Polaris Forge 1, Ellendale - enter work email

Unlock the complete facility dossier for Polaris Forge 1, Ellendale (Ellendale, North Dakota): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

Other data centers in North Dakota

Full site dossier & United States dataset

Unlock Polaris Forge 1, Ellendale permit PDFs, MW timeline & 1,304 other data centers

This page is the public summary for Polaris Forge 1, Ellendale in Ellendale, North Dakota. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Polaris Forge 1, Ellendale
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Macquarie Asset Management in North Dakota

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Polaris Forge 1, Ellendale?

Polaris Forge 1, Ellendale is recorded under Macquarie Asset Management. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Polaris Forge 1, Ellendale?

In Ellendale, North Dakota. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Polaris Forge 1, Ellendale have?

400 MW, as stated by Applied Digital (SEC 8-K Ex. 99.1). The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 1 linked page by Applied Digital (SEC 8-K Ex. 99.1). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.