AnalystAIReal Assets
Start free trial← United States data centers · All sites · Pennsylvania
Sourced site record, every fact links to its page
Panther Creek - Phase 1 is a planned data center in Carbon, Pennsylvania, listed under Keel Infrastructure. Planned capacity is 80 MW. Real Assets links 2 source pages, including Data Center Dynamics, Keel Infrastructure.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Pennsylvania has 20 data centers on record in Real Assets, with 960 MW reported as operating and 7.03 GW not yet operating. Panther Creek - Phase 1 is one of them.
Keel Infrastructure has 2 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Panther Creek - Phase 1 on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Panther Creek - Phase 1 is recorded under Keel Infrastructure. The operator is the name its sources give, which can differ from the owner or the tenant.
In Carbon, Pennsylvania. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
80 MW. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
From 2 linked pages by Data Center Dynamics, Keel Infrastructure. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.