AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
OpenAI Stargate Port Washington Campus is an under construction data center in Port Washington / Ozaukee County, Wisconsin, listed under OpenAI. Planned capacity is 1 GW according to Epoch AI Frontier Data Centers. Real Assets links 6 source pages, including Epoch AI Frontier Data Centers, Drive Official Source, urbanmilwaukee.com.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 7 data centers in Wisconsin that have a page.
OpenAI has 4 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
6 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see OpenAI Stargate Port Washington Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
OpenAI Stargate Port Washington Campus is recorded under OpenAI. The operator is the name its sources give, which can differ from the owner or the tenant.
In Port Washington / Ozaukee County, Wisconsin. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
1 GW, as stated by Epoch AI Frontier Data Centers. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today: 0 MW.
From 6 linked pages by Epoch AI Frontier Data Centers, Drive Official Source, urbanmilwaukee.com, Vantage Data Centers. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.