AnalystAIReal Assets
Start free trial← United States data centers · All sites
Sourced site record, every fact links to its page
Novva Data Centers West Jordan Flagship Campus is an operating data center in West Jordan / Salt Lake County, Utah, listed under Novva Data Centers. Capacity is 175 MW according to American Public Power Association. Real Assets links 2 source pages, including Baxtel, American Public Power Association.
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Real Assets records 6 data centers in Utah that have a page.
Novva Data Centers has 2 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see Novva Data Centers West Jordan Flagship Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Novva Data Centers West Jordan Flagship Campus is recorded under Novva Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.
In West Jordan / Salt Lake County, Utah. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
175 MW, as stated by American Public Power Association. Operating capacity today is not recorded.
From 2 linked pages by Baxtel, American Public Power Association. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.