AnalystAIReal Assets
Start free trial← United States data centers · All sites · Texas
Sourced site record, every fact links to its page
MARA Holdings Granbury Hybrid Compute Campus is an operating data center in Granbury / Hood County, Texas, listed under MARA Holdings. Capacity is 300 MW according to SEC EDGAR (company filing). Real Assets links 2 source pages, including baxtel.com, SEC EDGAR (company filing).
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Texas has 166 data centers on record in Real Assets, with 8.93 GW reported as operating and 69.97 GW not yet operating. MARA Holdings Granbury Hybrid Compute Campus is one of them.
MARA Holdings has 3 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see MARA Holdings Granbury Hybrid Compute Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
MARA Holdings Granbury Hybrid Compute Campus is recorded under MARA Holdings. The operator is the name its sources give, which can differ from the owner or the tenant.
In Granbury / Hood County, Texas. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
300 MW, as stated by SEC EDGAR (company filing). Operating capacity today is not recorded.
From 2 linked pages by baxtel.com, SEC EDGAR (company filing). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.