← United States data centers · All sites · Illinois
Sourced site record, every fact links to its page
CloudHQ ORD Campus:data center in Mount Prospect, Illinois.
CloudHQ ORD Campus is a planned data center in Mount Prospect, Illinois, listed under CloudHQ. Planned capacity is 252 MW according to CloudHQ. Real Assets links 3 source pages, including Data Center Frontier, Baxtel.
Open this site on the map View permit PDFs & MW timelineplanned data center · 3 linked sources
- CloudHQ
- Mount Prospect
- Illinois
Approximate metro position & Illinois peer sites (exact coordinates require sign-in)
Facts on record
- OperatorCloudHQ
- City and stateMount Prospect, Illinois
- Statusplanned
- Planned capacity252 MW, as stated by CloudHQ
- Expected completionNot recorded
- Sources linked3 from 2 publishers
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Illinois has 67 data centers on record in Real Assets, with 445.8 MW reported as operating and 9.37 GW not yet operating. CloudHQ ORD Campus is one of them.
CloudHQ has 8 data centers on record in the United States: 2 operating and 6 planned or under construction.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- CloudHQ Breaks Ground on $2.5 Billion Chicago Data Center Campus
Data Center Frontier, datacenterfrontier.com, published 24 August 2022Web page - CloudHQ: Mount Prospect ORD Campus Data Center Campus
Baxtel, baxtel.comWeb page - 1 additional source filing & extracted fact citations for CloudHQ ORD Campus
Full source ledger and verbatim fact quotes in workspace🔒 Source ledger - Government permit PDFs, regulatory filings & municipal zoning records (Mount Prospect, Illinois)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for CloudHQ ORD Campus🔒 MW timeline
3 sources on record; 2 shown above and 1 in the full site dossier. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for CloudHQ ORD Campus - enter work email
Unlock the complete facility dossier for CloudHQ ORD Campus (Mount Prospect, Illinois): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More CloudHQ data centers in Illinois
- CloudHQ Mount Prospect Campus
Mount Prospect, Illinois, under constructionNot recorded
CloudHQ data centers in other states
- CloudHQ SAT Campus
San Antonio, Texas, planned600 MW - CloudHQ CLP Campus
Culpeper, Virginia, planned215 MW - CloudHQ MSP1
Chaska, Minnesota, planned200 MW - CloudHQ LC8
Ashburn, Virginia, planned108 MW - CloudHQ Ashburn Campus
Ashburn, Virginia, operatingNot recorded - CloudHQ Manassas Campus
Manassas, Virginia, operatingNot recorded
Other data centers in Illinois
- Joliet Technology Center
Joliet, Illinois, planned1.8 GW - 8080 S DuSable Lake Shore Drive
Chicago, Illinois, planned1 GW - TerraWatt Riverbend Technology Center (former Alton Steel site)
Alton, Illinois, planned1 GW - Tract Illinois (Morris)
Morris, Illinois, planned1 GW - CyrusOne - Talkington Township Campus
Talkington Township, Illinois, planned600 MW - Cloverleaf Infrastructure Troy Campus
Troy, Illinois, planned500 MW
Full site dossier & United States dataset
Unlock CloudHQ ORD Campus permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for CloudHQ ORD Campus in Mount Prospect, Illinois. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for CloudHQ ORD Campus
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for CloudHQ in Illinois
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates CloudHQ ORD Campus?
CloudHQ ORD Campus is recorded under CloudHQ. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is CloudHQ ORD Campus?
In Mount Prospect, Illinois. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does CloudHQ ORD Campus have?
252 MW, as stated by CloudHQ. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 3 linked pages by Data Center Frontier, Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.