AnalystAIReal Assets Start free trial

← United States data centers · All sites · Illinois

Sourced site record, every fact links to its page

Cloverleaf Infrastructure Troy Campus:data center in Troy, Illinois.

Cloverleaf Infrastructure Troy Campus is a planned data center in Troy, Illinois, listed under Cloverleaf Infrastructure. Planned capacity is 500 MW according to Data Center Dynamics. Real Assets links 2 source pages, including St. Louis Public Radio (Belleville News-Democrat content), Data Center Dynamics.

Open this site on the map Start a 7-day trial
500 MWplanned capacity
Plannedstatus
2source pages linked
Not recordedexpected completion

Facts on record

  • OperatorCloverleaf Infrastructure
  • City and stateTroy, Illinois
  • Statusplanned
  • Planned capacity500 MW, as stated by Data Center Dynamics
  • Operating capacity todayNot recorded
  • Land areaNot recorded
  • Building floor areaNot recorded
  • Expected completionNot recorded
  • Sources linked2 from 2 publishers
  • Record updated25 October 2026

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Illinois has 36 data centers on record in Real Assets, with 435 MW reported as operating and 8.77 GW not yet operating. Cloverleaf Infrastructure Troy Campus is one of them.

Cloverleaf Infrastructure has 1 data center in the United States with a page.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.

Sources: the pages that published these facts

2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.

Other data centers in Illinois

Full market dataset & site-level records

Open Cloverleaf Infrastructure Troy Campus and 677 other data centers

This page is the public summary. Start a 7-day trial or sign in to see Cloverleaf Infrastructure Troy Campus on the map with its exact location, every sourced figure and the filings behind it.

  • Every individual site on the interactive map with coordinates
  • Operating vs. pipeline capacity, operator and owner records
  • Sourced M&A, lease and financing transactions
  • Direct link to the filing, report or news page behind every figure
or unlock with work email

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Questions

Who operates Cloverleaf Infrastructure Troy Campus?

Cloverleaf Infrastructure Troy Campus is recorded under Cloverleaf Infrastructure. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Cloverleaf Infrastructure Troy Campus?

In Troy, Illinois. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Cloverleaf Infrastructure Troy Campus have?

500 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by St. Louis Public Radio (Belleville News-Democrat content), Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.