AnalystAIReal Assets
Start free trial← United States data centers · All sites · Georgia
Sourced site record, every fact links to its page
CleanSpark Sandersville AI Mega-Campus is an under construction data center in Sandersville / Washington County, Georgia, listed under CleanSpark. Capacity is not recorded. Real Assets links 2 source pages, including Davis Polk & Wardwell, SEC EDGAR (company filing).
Open this site on the map Start a 7-day trialNot recorded means no source states it. Real Assets does not fill a gap with an estimate.
Georgia has 53 data centers on record in Real Assets, with 1.48 GW reported as operating and 15.4 GW not yet operating. CleanSpark Sandersville AI Mega-Campus is one of them.
CleanSpark has 2 data centers in the United States with a page.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 25 October 2026.
2 sources on record. The links open the original pages, not copies. How the data is built and what a source line means.
Full market dataset & site-level records
This page is the public summary. Start a 7-day trial or sign in to see CleanSpark Sandersville AI Mega-Campus on the map with its exact location, every sourced figure and the filings behind it.
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
CleanSpark Sandersville AI Mega-Campus is recorded under CleanSpark. The operator is the name its sources give, which can differ from the owner or the tenant.
In Sandersville / Washington County, Georgia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
No capacity figure is recorded for this site. Real Assets does not estimate one.
From 2 linked pages by Davis Polk & Wardwell, SEC EDGAR (company filing). Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.