← United States data centers · All sites · Virginia
Sourced site record, every fact links to its page
Carmel Church Data Hub:data center in Ruther Glen, Virginia.
Carmel Church Data Hub is a planned data center in Ruther Glen, Virginia, listed under AVAIO Digital Partners. Planned capacity is 300 MW according to Data Center Dynamics. Real Assets links 2 source pages, including Data Center Dynamics.
Open this site on the map View permit PDFs & MW timelineplanned data center · 2 linked sources
- AVAIO Digital Partners
- Ruther Glen
- Virginia
Approximate metro position & Virginia peer sites (exact coordinates require sign-in)
Facts on record
- OperatorAVAIO Digital Partners
- City and stateRuther Glen, Virginia
- Statusplanned
- Planned capacity300 MW, as stated by Data Center Dynamics
- Expected completion2026
- Sources linked2 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Virginia has 200 data centers on record in Real Assets, with 2.92 GW reported as operating and 24.35 GW not yet operating. Carmel Church Data Hub is one of them.
AVAIO Digital Partners has 6 data centers on record in the United States: 0 operating and 6 planned or under construction. See AVAIO Digital Partners in Virginia (3 sites).
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Avaio plans 300MW data center campus in Appomattox County, Virginia
Data Center Dynamics, datacenterdynamics.com, published 18 September 2026Web page - Avaio plans 300MW data center campus in Appomattox County, Virginia
Data Center Dynamics, baxtel.comWeb page - Government permit PDFs, regulatory filings & municipal zoning records (Ruther Glen, Virginia)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Carmel Church Data Hub🔒 MW timeline
2 sources on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Carmel Church Data Hub - enter work email
Unlock the complete facility dossier for Carmel Church Data Hub (Ruther Glen, Virginia): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More AVAIO Digital Partners data centers in Virginia
- Avaio Digital Appomattox
Appomattox, Virginia, planned300 MW - Farmville Data Hub
Prince Edward, Virginia, planned300 MW
AVAIO Digital Partners data centers in other states
- AVAIO Digital Leo
Wrightsville, Arkansas, planned1 GW - AVAIO Digital Taurus (Rankin County)
Brandon, Mississippi, under construction116 MW - AVAIO Pittsburg
Pittsburg, California, planned92 MW
Other data centers in Virginia
- Hanover Technology Park
Ashland, Virginia, planned2.4 GW - Birchwood AWS
King George, Virginia, planned2.18 GW - West Creek Business Park
Goochland County, Virginia, planned1.2 GW - CleanArc VA1 Campus
Ruther Glen, Virginia, under construction900 MW - Tuckahoe Technology Park
Goochland County, Virginia, planned900 MW - PowerHouse 95 Spotsylvania Mega-Campus
Thornburg, Virginia, planned800 MW
Full site dossier & United States dataset
Unlock Carmel Church Data Hub permit PDFs, MW timeline & 1,304 other data centers
This page is the public summary for Carmel Church Data Hub in Ruther Glen, Virginia. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Carmel Church Data Hub
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for AVAIO Digital Partners in Virginia
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Carmel Church Data Hub?
Carmel Church Data Hub is recorded under AVAIO Digital Partners. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Carmel Church Data Hub?
In Ruther Glen, Virginia. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Carmel Church Data Hub have?
300 MW, as stated by Data Center Dynamics. The site is not operating yet, so this is a stated plan, not delivered capacity. Operating capacity today is not recorded.
Where does this information come from?
From 2 linked pages by Data Center Dynamics. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.