AnalystAIReal Assets Start free trial

← United States data centers · All sites · Illinois · Chicago

Sourced site record, every fact links to its page

Aligned Coal City Campus:data center in Chicago, Illinois.

Aligned Coal City Campus is a planned data center in Chicago, Illinois, listed under Aligned Data Centers. Capacity is not recorded. Real Assets links 1 source page, including Baxtel.

Open this site on the map View permit PDFs & MW timeline
Chicago, IllinoisAligned Data Centers
Planned

planned data center · 1 linked source

  • Aligned Data Centers
  • Chicago
  • Illinois
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & Illinois peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
Not recordedplanned capacity
Plannedstatus
1source page linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

Illinois has 67 data centers on record in Real Assets, with 445.8 MW reported as operating and 9.37 GW not yet operating. Aligned Coal City Campus is one of them.

Aligned Data Centers has 46 data centers on record in the United States: 24 operating and 21 planned or under construction. See Aligned Data Centers in Illinois (4 sites).

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • Aligned: Coal City Campus Data Center
    Baxtel, baxtel.com
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Chicago, Illinois)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Aligned Coal City Campus
    🔒 MW timeline

1 source on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Aligned Coal City Campus - enter work email

Unlock the complete facility dossier for Aligned Coal City Campus (Chicago, Illinois): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More Aligned Data Centers data centers in Illinois

Aligned Data Centers data centers in other states

Other data centers in Illinois

Full site dossier & United States dataset

Unlock Aligned Coal City Campus permit PDFs, MW timeline & 1,304 other data centers

This page is the public summary for Aligned Coal City Campus in Chicago, Illinois. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Aligned Coal City Campus
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for Aligned Data Centers in Illinois

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Aligned Coal City Campus?

Aligned Coal City Campus is recorded under Aligned Data Centers. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Aligned Coal City Campus?

In Chicago, Illinois. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Aligned Coal City Campus have?

No capacity figure is recorded for this site. Real Assets does not estimate one.

Where does this information come from?

From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.