← United States data centers · Tract (13) · Virginia (200)
Live market record, the source behind every published figure
Tract in Virginia:3 data center sites.
As of 11 November 2026, Real Assets tracks 3 data center sites listed under Tract in Virginia: 0 operating and 3 planned or under construction. Reported power capacity in Virginia: 1.8 GW not yet operating. Virginia accounts for 23% of Tract's 13 tracked sites in the United States, and Tract accounts for 2% of the 200 tracked sites in Virginia.
Unlock all 3 Tract sites in Virginia0 operating · 3 planned · 2% of Virginia
- 23% of Tract in United States
- #1 in Virginia
Mapped Tract sites in Virginia (highlighted) against all Virginia sites
Tract across United States
- Nevada5
- Virginia3
- Arizona2
- Illinois1
- Iowa1
- View all 13 Tract sites in United States →
Top operators in Virginia
Tract in Virginia: 3 data centers with their own page
- Hanover Technology Park
Ashland, planned2.4 GW - Tuckahoe Technology Park
Goochland County, planned900 MW - Tract Hanover Data Center Campus
Ashland, under constructionNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Locked regional footprint & primary filings
View all 3 Tract sites in Virginia, government permit PDFs & MW timeline - enter work email
Unlock every Tract facility in Virginia on the interactive map with exact parcel coordinates, operating vs. planned MW by phase, and primary regulatory filings.
Tract: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Tract, with disclosed capital expenditure, lease commitments and capacity figures.
- Tract Capital Master-Planned Gigawatt Data Center Land & Power Parks Portfolio Report (Annual Report · 2025 · filed 10 June 2025)
Details Tract's 23,000+ acre portfolio of zoned, utility-served gigawatt data center parks across Reno (Storey County, Nevada), Buckeye (Maricopa County, Arizona), Eagle Mountain (Utah), Caldwell County (Texas), Hanover County (Virginia), and Carver/Dakota Counties (Minnesota).Annual Report ↗ - Unlock all Tract filings and extracted figures →
Full market dataset & site-level records
Unlock all 3 Tract data center sites in Virginia
Inspect every Tract facility in Virginia on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Ask Real Assets from ChatGPT, Claude and Claude Code: connect it from your account after you sign in
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Tract have in Virginia?
3 tracked as of 11 November 2026: 0 operating and 3 planned or under construction. That is 23% of Tract's 13 tracked sites in the United States.
How much power capacity does Tract have in Virginia?
Reported power capacity in Virginia: 1.8 GW not yet operating.
How does Tract rank among data center operators in Virginia?
Tract ranks number 1 in Virginia by sites tracked, with 3 of the 200 sites recorded in Virginia (2%).
Where else does Tract operate in the United States?
Tract has 13 tracked sites across the United States: Nevada (5), Virginia (3), Arizona (2), Illinois (1), Iowa (1).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data