← United States data centers · Google (65) · Virginia (128)
Live market record, the source behind every published figure
Google in Virginia:7 data center sites.
As of 30 October 2026, Real Assets tracks 7 data center sites listed under Google in Virginia: 5 operating and 2 planned or under construction. Reported power capacity in Virginia: 315 MW operating, 264 MW not yet operating. Virginia accounts for 11% of Google's 65 tracked sites in the United States, and Google accounts for 5% of the 128 tracked sites in Virginia.
Unlock all 7 Google sites in Virginia5 operating · 2 planned · 5% of Virginia
- 11% of Google in United States
- 315 MW operating
- #6 in Virginia
Mapped Google sites in Virginia (highlighted) against all Virginia sites
Google across United States
- Texas8
- Virginia7
- Indiana5
- Nebraska5
- Ohio5
- View all 65 Google sites in United States →
Top operators in Virginia
Google in Virginia: 7 data centers with their own page
- Google Bristow
Bristow, operating286 MW - Google Project Peanut
Chester, planned200 MW - Google Arcola
Sterling, operating93 MW - Chesterfield County, Virginia
Chesterfield County, plannedNot recorded - Google Loudoun County Campus
Leesburg, operatingNot recorded - Loudoun County, Virginia
Loudoun County, operatingNot recorded - Prince William County, Virginia
Prince William County, operatingNot recorded
Ranked by reported MW. Capacity is as stated by the publisher; where none is stated it says not recorded.
Google: SEC filings, annual reports and disclosed figures
Primary regulatory filings and annual reports on record for Google, with disclosed capital expenditure, lease commitments and capacity figures.
- Alphabet 2025 Annual Report on Form 10-K (10-K · FY 2025 · filed 31 December 2025)
Alphabet FY 2025 Form 10-K (Note 4 Leases & Note 6 Commitments): Discloses $91.45 billion in purchases of property and equipment in 2025 (up from $52.54 billion in 2024), $58.5 billion in uncommenced lease commitments primarily for data centers ($5.8 billion short-term and $52.7 billion long-term, commencing 2026 to 2031 over 1 to 25 year terms), $15.90 billion in credit backstop obligations for third-party data center leases, and a definitive agreement to acquire data center and energy developer Intersect for $4.8 billion in cash plus assumed debt.10-K ↗ - Alphabet Inc. FY 2024 Form 10-K Annual Report (Technical Infrastructure & Data Center Capital Expenditures) (10-K · FY 2024 · filed 5 February 2025)
Reports $52.5B in FY 2024 capital expenditures primarily for technical infrastructure including servers, TPU clusters, and global hyperscale data center campuses across North America, Europe, and Asia-Pacific, alongside $75B projected FY 2025 technical infrastructure investment.10-K ↗ - Alphabet Q4 2024 Earnings Release (8-K / Earnings Release · Q4 2024 · filed 4 February 2025)
This earnings release details Alphabet's financial performance for the fourth quarter and fiscal year ended December 31, 2024. It provides consolidated revenue figures, segment operating results for Google Services and Google Cloud, and key metrics such as operating income, net income, and employee headcount.8-K / Earnings Release ↗ - Unlock all Google filings and extracted figures →
Full market dataset & site-level records
Unlock all 7 Google data center sites in Virginia
Inspect every Google facility in Virginia on the interactive map, with site-by-site capacity, status, and primary source links.
- Every individual site on the interactive map with coordinates
- Operating vs. pipeline capacity, operator and owner records
- Sourced M&A, lease and financing transactions
- Direct link to the filing, report or news page behind every figure
- Use Real Assets inside ChatGPT, Claude and Claude Code via MCP (
https://realassets.analystai.ai/mcp)
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
How this data is built
Real Assets reads company pages, filings, news and listings, and records figures with a link to the page that published them.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Sites are listed with the operator as published (the owner for industrial parks). Data updated 30 October 2026; this page was built on 30 October 2026 at 14:06 UTC, so the live app can show a few more or fewer sites and deals.
Questions
How many data center sites does Google have in Virginia?
7 tracked as of 30 October 2026: 5 operating and 2 planned or under construction. That is 11% of Google's 65 tracked sites in the United States.
How much power capacity does Google have in Virginia?
Reported power capacity in Virginia: 315 MW operating, 264 MW not yet operating.
How does Google rank among data center operators in Virginia?
Google ranks number 6 in Virginia by sites tracked, with 7 of the 128 sites recorded in Virginia (5%).
Where else does Google operate in the United States?
Google has 65 tracked sites across the United States: Texas (8), Virginia (7), Indiana (5), Nebraska (5), Ohio (5).
Where does the data come from?
Figures link to the page that published them. Publishers behind this market's data include Epoch AI, Data Center Dynamics, Baxtel, SemiAnalysis, CyrusOne.
See every site, operator and source
This page is the summary. The workspace has the full list, the map, the deals and the sources behind each figure.
Open the data centers data