← Europe data centers · All sites · Netherlands
Sourced site record, every fact links to its page
Equinix Enschede EN1:data center in Enschede, Netherlands.
Equinix Enschede EN1 is an operating data center in Enschede, Netherlands, listed under Equinix. Capacity is not recorded. Real Assets links 1 source page, including Baxtel.
Open this site on the map View permit PDFs & MW timelineoperating data center · 1 linked source
- Equinix
- Enschede
- Netherlands
Approximate metro position & Netherlands peer sites (exact coordinates require sign-in)
Facts on record
- OperatorEquinix
- City and countryEnschede, Netherlands
- Statusoperating
- CapacityNot recorded
- Expected completionNot recorded
- Sources linked1 from 1 publisher
- Record updated5 November 2026
- Exact parcel coordinates & street address🔒 View on parcel map
- Phase-by-phase MW timeline & utility grid link🔒 Unlock MW schedule
- Government permits, zoning PDFs & deal history🔒 Unlock 3 dossier records
Not recorded means no source states it. Real Assets does not fill a gap with an estimate.
Where it sits
Netherlands has 39 data centers on record in Real Assets, with 856.8 MW reported as operating and 320 MW not yet operating. Equinix Enschede EN1 is one of them.
Equinix has 89 data centers on record in Europe: 88 operating and 1 planned or under construction. See Equinix in Netherlands (12 sites). Compare Digital Realty vs Equinix.
Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 13:26 UTC, so the live app can show a few more or fewer sites and deals.
Sources: the pages that published these facts
- Equinix Enschede EN1 Data Center
Baxtel, baxtel.comWeb page - Government permit PDFs, regulatory filings & municipal zoning records (Enschede, Netherlands)
Air/water permits, substation filings, tax abatements & site plans🔒 Permit PDFs - Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
Audited facility timeline and transaction history for Equinix Enschede EN1🔒 MW timeline
1 source on record. Public links open the original pages. How the data is built and what a source line means.
Locked site dossier & primary filings
View the 3 government permit PDFs, source filings & MW timeline for Equinix Enschede EN1 - enter work email
Unlock the complete facility dossier for Equinix Enschede EN1 (Enschede, Netherlands): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.
More Equinix data centers in Netherlands
- Equinix AM3 / AM4 Science Park
Amsterdam, Netherlands, operating38 MW - Amsterdam IBX Data Center AM4
Amsterdam, Netherlands, operating22 MW - Amsterdam IBX Data Center AM7
Amsterdam, Netherlands, operating16 MW - Amsterdam IBX Data Center AM5
Amsterdam, Netherlands, operating15 MW - Amsterdam IBX Data Center AM3
Amsterdam, Netherlands, operating12 MW - Amsterdam IBX Data Center AM11
Amsterdam, Netherlands, operating10 MW
Equinix data centers in other countries
- Equinix Hertfordshire Campus (DC01UK)
South Mimms, United Kingdom, planned250 MW - Equinix LD4 / LD5 / LD6 / LD10 Slough Campus
Slough, United Kingdom, operating95 MW - Equinix FR9x / FR11x (xScale Hyperscale)
Frankfurt, Germany, operating54 MW - Equinix PA3 / PA4 / PA10 Saint-Denis Campus
Saint-Denis, France, operating50 MW - Equinix FR2 / FR2.1 / FR2.2 Frankfurt
Frankfurt, Germany, operating45 MW - Equinix Zurich Campus (ZH2, ZH4 & ZH5)
Zurich, Switzerland, operating45 MW
Other data centers in Netherlands
- VOLT Rotterdam AI Gigafactory
Rotterdam, Netherlands, planned200 MW - Google Eemshaven Data Center
Eemshaven, Netherlands, operating180 MW - Google Middenmeer Data Center Campus
Middenmeer, Netherlands, operating120 MW - Google Winschoten Data Center Campus
Winschoten, Netherlands, operating120 MW - Microsoft AMS13/14 + land
Middenmeer, Netherlands, planned120 MW - Digital Realty Amsterdam Schiphol (AMS1-AMS9)
Schiphol-Rijk, Netherlands, operating75 MW
Full site dossier & Europe dataset
Unlock Equinix Enschede EN1 permit PDFs, MW timeline & 511 other data centers
This page is the public summary for Equinix Enschede EN1 in Enschede, Netherlands. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.
- Exact parcel coordinates, street address and interactive map pin for Equinix Enschede EN1
- Phase-by-phase operating vs. planned MW timeline and utility/substation records
- All 3 linked primary sources, government permit PDFs and regulatory filings
- Recorded M&A, lease and financing transactions for Equinix in Netherlands
7-day free trial or subscription required for full site-level data. Instant sign-in with no password.
Free weekly market briefing
Not ready for a trial? Get the weekly email update
Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.
Questions
Who operates Equinix Enschede EN1?
Equinix Enschede EN1 is recorded under Equinix. The operator is the name its sources give, which can differ from the owner or the tenant.
Where is Equinix Enschede EN1?
In Enschede, Netherlands. This page does not publish a street address or map coordinates; the workspace shows the location on the map.
How much power does Equinix Enschede EN1 have?
No capacity figure is recorded for this site. Real Assets does not estimate one.
Where does this information come from?
From 1 linked page by Baxtel. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.