AnalystAIReal Assets Start free trial

← Europe data centers · All sites · France

Sourced site record, every fact links to its page

Data4 Marcoussis Campus (PAR1-PAR8):data center in Nozay, France.

Data4 Marcoussis Campus (PAR1-PAR8) is an operating data center in Nozay, France, listed under DATA4. Capacity is 250 MW according to DATA4. Real Assets links 2 source pages, including data4group.com, DATA4.

Open this site on the map View permit PDFs & MW timeline
Nozay, FranceDATA4
250 MW

operating data center · 2 linked sources

  • DATA4
  • Nozay
  • France
🔒Exact parcel coordinates & neighboring pins locked · Open interactive map

Approximate metro position & France peer sites (exact coordinates require sign-in)

Instant code or 1-click sign-in:
250 MWcapacity
Operatingstatus
2source pages linked
Not recordedexpected completion

Facts on record

Not recorded means no source states it. Real Assets does not fill a gap with an estimate.

Where it sits

France has 62 data centers on record in Real Assets, with 951.4 MW reported as operating and 1.46 GW not yet operating. Data4 Marcoussis Campus (PAR1-PAR8) is one of them.

DATA4 has 12 data centers on record in Europe: 7 operating and 5 planned or under construction. See DATA4 in France (3 sites). Compare Digital Realty vs DATA4.

Counts are sites Real Assets has recorded, not a full census, and grow as coverage grows. Data updated 11 November 2026; this page was built on 11 November 2026 at 14:50 UTC, so the live app can show a few more or fewer sites and deals.

Sources: the pages that published these facts

  • data center audit 9 city
    www.data4group.com, published 1 April 2018
    Web page
  • DATA4 - Data centers to Scale your Business
    DATA4, data4group.com, published 22 February 2018
    Web page
  • Government permit PDFs, regulatory filings & municipal zoning records (Nozay, France)
    Air/water permits, substation filings, tax abatements & site plans
    🔒 Permit PDFs
  • Phase-by-phase MW capacity timeline, power utility & tenant/lease ledger
    Audited facility timeline and transaction history for Data4 Marcoussis Campus (PAR1-PAR8)
    🔒 MW timeline

2 sources on record. Public links open the original pages. How the data is built and what a source line means.

Locked site dossier & primary filings

View the 3 government permit PDFs, source filings & MW timeline for Data4 Marcoussis Campus (PAR1-PAR8) - enter work email

Unlock the complete facility dossier for Data4 Marcoussis Campus (PAR1-PAR8) (Nozay, France): primary permit PDFs, phase-by-phase MW delivery schedule, substation & utility records, and exact parcel coordinates.

Instant 6-digit code or 1-click work sign-in (no password):

More DATA4 data centers in France

DATA4 data centers in other countries

Other data centers in France

Full site dossier & Europe dataset

Unlock Data4 Marcoussis Campus (PAR1-PAR8) permit PDFs, MW timeline & 511 other data centers

This page is the public summary for Data4 Marcoussis Campus (PAR1-PAR8) in Nozay, France. Enter your work email or sign in to inspect exact parcel coordinates, government permit PDFs, MW timeline, and every sourced filing.

  • Exact parcel coordinates, street address and interactive map pin for Data4 Marcoussis Campus (PAR1-PAR8)
  • Phase-by-phase operating vs. planned MW timeline and utility/substation records
  • All 3 linked primary sources, government permit PDFs and regulatory filings
  • Recorded M&A, lease and financing transactions for DATA4 in France

or continue in one click

7-day free trial or subscription required for full site-level data. Instant sign-in with no password.

Free weekly market briefing

Not ready for a trial? Get the weekly email update

Once a week: new deals, primary filings and capacity changes recorded in this market. Free, with one-click unsubscribe.

Questions

Who operates Data4 Marcoussis Campus (PAR1-PAR8)?

Data4 Marcoussis Campus (PAR1-PAR8) is recorded under DATA4. The operator is the name its sources give, which can differ from the owner or the tenant.

Where is Data4 Marcoussis Campus (PAR1-PAR8)?

In Nozay, France. This page does not publish a street address or map coordinates; the workspace shows the location on the map.

How much power does Data4 Marcoussis Campus (PAR1-PAR8) have?

250 MW, as stated by DATA4. Operating capacity today is not recorded.

Where does this information come from?

From 2 linked pages by data4group.com, DATA4. Every link on this page goes to the original page. Anything not published there shows as not recorded, never as an estimate.